Before There Was Management

Management is a rather recent invention in the history of human evolution – it’s been around for maybe 100 or 150 years, about two or three times longer than software. But people have been living together for thousands of years, and it could be argued that over those thousands of years, we did pretty well without managers. People are social beings, hardwired through centuries of evolution to protect their family and community, and to provide for the next generation. For tens of thousands of years, people have lived together in small hamlets or clans that were relatively self-sufficient, where everyone knew – and was probably related to – everyone else. These hamlets inevitably had leaders to provide general direction, but day-to-day activities were governed by a set of well understood mutual obligations. As long as the hamlets stayed small enough, this was just about all the governance that was needed; and most hamlets stayed small enough to thrive without bureaucracy until the Industrial Revolution.

The Magic Number One Hundred and Fifty
Early in his career, British Anthropologist Robin Dunbar found himself studying the sizes of monkey colonies, and he noticed that different species of monkeys preferred different size colonies. Interestingly, the size of a monkey colony seemed to be related to the size of the monkeys’ brains; the smaller the brain, the smaller the colony. Dunbar theorized that brain size limits the number of social contacts that a primate could maintain at one time. Thinking about how humans seemed to have evolved from primates, Dunbar wondered if, since the human brain was larger than the monkey brain, humans would tend to live in larger groups. He calculated the maximum group size that humans would be likely to live in based on the relative size of the human brain, and arrived at a number just short of 150. Dunbar theorized that humans might have a limit on their social channel capacity (the number of individuals with whom a stable inter-personal relationship can be maintained) of about 150.[1]

To test his theory, Dunbar and other researchers started looking at the size of social groups of people. They found that a community size of 150 has been a very common maximum limit in human societies around the world going back in time as far as they can investigate. And Dunbar’s Number (150) isn’t found only in ancient times. The Hutterites, a religious group that formed self-sufficient agricultural communities in Europe and North America, have kept colonies under 150 people for centuries. Beyond religious communities, Dunbar found that during the eighteenth century, the average number of people in villages in every English county except Kent was around 160. (In Kent it was 100.) Even today, academic communities that are focused on a particular narrow discipline tend to be between 100 and 200 – when the community gets larger, it tends to split into sub-disciplines.[2]

Something akin to Dunbar’s number can be found in the world of technology also. When Steve Jobs ran the Mackintosh department at Apple, his magic number was 100. He figured he could not remember more than 100 names, so the department was limited to 100 people at one time. A team that never exceeded 100 people designed and developed both the hardware and software that became the legendary Apple Macintosh.[3] Another example: in a 2004 blog The Dunbar Number as a Limit to Group Sizes, Christopher Allen noted that on-line communities tend to have 40 to 60 active members at any one time. You can see two peaks in Allen’s chart of group satisfaction as a function of group size – one peak for a team size of 5 to 8, and an equally high peak when team size is around 50.[4]
Steve Job’s limit of 100 people was probably a derivative of the Dunbar Number, but Allen’s peak at 50 is something different. According to Dunbar, “If you look at the pattern of relationships within… our social world, a number of circles of intimacy can be detected. The innermost group consists of about three to five people. … Above this is a slightly larger grouping that typically consists of about ten additional people. And above this is a slightly bigger circle of around thirty more…”[5] In case you’ve stopped counting, the circles of intimacy are 5, 15, 50, 150 – each circle about three times the size of the smaller circle. The number 50, which Allen found in many on-line communities, is the number of people Dunbar found in many hunting groups in ancient times – and three of these groups of 50 would typically make up a clan.

Does this Work in Companies?
One Hundred and fifty is certainly a magic number for W.L. Gore & Associates. Gore is a privately held business that specializes in developing and manufacturing innovative products based on PTFE, the fluoropolymer in Gore-Tex fabrics. Gore has revenues exceeding 2.5 billion US dollars, employs over 8000 people, and has been profitable for over a half a century. It has held a permanent spot on the U.S. "100 Best Companies to Work For" since it’s inception in 1984, and is a fixture on similar lists in many countries in Europe. This amazing track record might be related to the fact that Gore doesn’t have managers. There are plenty of leaders at Gore, but leaders aren’t assigned the job, they have to earn it by attracting followers.

You’ve got to wonder how such a large company can turn in such consistent performance for such a long period of time without using traditional management structures. The answer seems to have something to do with the fact that Gore is organized into small businesses units that are limited to about 150 people. “We found again and again that things get clumsy at a hundred and fifty,” according to founder Bill Gore. So when the company builds a new plant, it puts 150 spaces in the parking lot, and when people start parking on the grass, they know it’s time to build a new plant.

Since associates at Gore do not have managers, they need different mechanisms to coordinate work, and interestingly, one of the key mechanisms is peer pressure. Here is a quote from Jim Buckley, a long-time associate at a Gore plant: “The pressure that comes to bear if we are not efficient as a plant, if we are not creating good enough earnings for the company, the peer pressure is unbelievable. …This is what you get when you have small teams, where everybody knows everybody. Peer pressure is much more effective than a concept of a boss. Many, many times more powerful.”[6]

Like many companies that depend on employees to work together and make good decisions, Gore is very careful to hire people who will fit well in its culture. Leaders create environments where people have the tools necessary for success and the information needed to make good decisions. Work groups are relatively stable so people get to know the capabilities and expectations of their colleagues. But in the end, the groups are organized around trust and mutual obligation – a throwback to the small communities in which humans have thrived for most of their history.

Google’s management culture has quite a few similarities with Gore’s. Google was designed to work more or less like a university – where people are encouraged to decide on their own (with guidance) what they want to investigate. Google is extremely careful about hiring people who will fit in its culture, and it creates environments where people can pursue their passion without too much management interference. For a deep dive into Google’s culture, see this video: Eric Schmidt at the Management Lab Summit

Peer Cultures
Before there were managers, peer cultures created the glue that held societies together. In clans and hamlets around the world throughout the centuries, the self-interest of the social group was tightly coupled with the self-interest of individuals and family units; and thus obligations based on family ties and reciprocity were essential in creating efficient communities.

There are many, many examples of peer cultures today, from volunteer organizations to open source software development to discussion forums and social networks on the web. In these communities, people are members by their own choice; they want to contribute to a worthy cause, get better at a personal skill, and feel good about their contribution. In a peer culture, leaders provide a vision, a way for people to contribute easily, and just enough guidance to be sure the vision is achieved.

Arguably, peer cultures work a lot better than management at getting many things done, because they create a social network and web of obligations that underlie intrinsic motivation. So perhaps we’d be better off taking a page out of the Gore or the Google or the Open Source playbook and leverage thousands of years of human evolution. We are naturally social beings and have a built-in need to protect our social unit and ensure that it thrives.

Example: Hardware/Software Products
“We have found through experience that the ideal team size is somewhere between 30 and 70,” the executive told us. At first we were surprised. Aren’t teams supposed to be limited to about 7 people? Don’t teams start breaking up when they’re much larger? Clearly the executive was talking about a different kind of team than we generally run into in agile software development. But his company was one of the most successful businesses we have encountered recently, so we figured there had to be something important in his observation.

We spend a morning with a senior project manager at the company – the guy who coordinated 60 people in the development of a spectacular product in record time. The resulting product was far ahead of its time and gave the company a significant competitive advantage. He explained how he coordinated the work: “Every 2 or 3 months we produced a working prototype, each one more sophisticated than the last one. As we were nearing the end of development, a new (faster, better, cheaper) chip hit the market. The team decided to delay the next prototype by two months so they could incorporate the new chip. Obviously we didn’t keep to the original schedule, but in this business, you have to be ready to seize the opportunities that present themselves.”

It’s not that this company had no small teams inside the larger teams; of course they did. It’s just that the coordination was done at the large team level, and the members of the smaller teams communicated on a regular basis with everyone on the larger team. All team members were keenly aware of the need to meet the prototype deadlines and they didn’t need much structure or encouragement to understand and meet the needs of their colleagues.

Another Example: Construction
The Lean Construction Institute has developed a similar approach to effectively organizing construction work. The first thing they do is to break down very large projects into multiple smaller ones so that a reasonable number of contractors can work together. (Remember Dunbar’s Number.) For example, they might completely separate a parking structure and landscaping from the main building; in a large building, the exterior would probably be a separate project from the interior. Each sub-project is further divided into phases of a few months; for example, foundation, structure, interior systems, etc. Before a phase starts, a meeting of all involved contractors is held and all of the things that need to be done to complete that phase are posted on cards on a wall by the contractors. The cards are organized into a timeline that takes dependencies into account, and all of the contractors agree that the wall represents a reasonable simulation of the work that needs to be done. This is not really a plan so much as an agreement among the contractors doing the work about what SHOULD be done to complete the phase.

Each week all of the “Last Planners” (crew chiefs, superintendents, etc.) get together and look at what they SHOULD do, and also what they CAN do, given the situation at the building site. Then they commit to each other what they WILL complete in the next week. The contractors make face-to-face commitments to peers that they know personally. This mutual commitment just plain gets things done faster and more reliably than almost any other organizing technique, including every classic scheduling approach in the book.

The Magic Number Seven
George Miller published “The Magical Number Seven, Plus or Minus Two” in The Psychological Review in 1956. Miller wasn’t talking about team size in this article; he was discussing the capacity of people to distinguish between alternatives. For example, most people can remember a string of 7 numbers, and they can divide colors or musical tones into about 7 categories. Ask people to distinguish between more than 7 categories, and they start making mistakes. “There seems to be some limitation built into us either by learning or by the design of our nervous systems, a limit that keeps our channel capacities in this general range [of seven],” Miller wrote.

This channel capacity seems to affect our direct interaction with other people – we can keep up a conversation with 7 or so people, but when a group gets larger, it is difficult to maintain a single dialog, and small groups tend to start separate discussions. So for face-to-face groups that must maintain a single conversation, the magic number of 7 +/-2 is a good size limit. And historically, most agile software development teams have been about this size.

Moving Beyond Seven
The problem is, 7 people are not enough to accomplish many jobs. Take the job of putting a new software-intensive product on the market, for example. The product is almost never about the software – the product is a medical device or a car or a mobile phone or maybe it’s a financial application. Invariably software is a subsystem of a larger overall system, which means that invariably the software development team is a sub-team of a larger overall system team.

In the book Scaling Lean & Agile Development, Craig Larman and Bas Vodde make a strong case for feature teams – cross-functional teams that deliver end-to-end customer features. They recommend against component teams, groups formed around a single component or layer of the system. I agree with their advice, but it seems to me that software is invariably a component of whatever system we are building. We might be creating software to automate a process or software to control a product, software to deliver information or software to provide entertainment. But our customers don’t care about the software; they care about how the product or process works, how relevant the information is or how entertaining the game might be. And if software is a component of a system, then software teams are component teams. What we might want to consider is that real feature teams – teams chartered to achieve a business goal – will almost certainly include more than software development.


Agile development started out as a practice for small software teams, but these days we often see teams of 40 or 50 developers applying agile practices to a single business problem. In almost every case, we notice that the developers are organized into several small teams that work quite separately – and in almost every case, therefore, the biggest problem seems to be coordination across the small teams. There are many mechanisms: use a divisible system architecture so teams can be truly independent; draw from a common list of tasks, which makes teams highly interdependent; send small team representatives to weekly coordinating meetings; and so on. But rarely do we see the most powerful coordination mechanism of all for groups this size: create a sense of mutual obligation through peer commitments.

Mutual Obligation
You can call mutual obligation peer pressure if you like, but whatever name you use, when individuals on a large team make a commitment to people they know well, the commitment will almost certainly be honored. Mutual obligation is a much more powerful motivating force than being told to do something by an authority figure. And the interesting thing is, the power of mutual obligation is not confined to small teams. It works very well in teams of 50, and can be effective with teams up to 150. The time to split teams is not necessarily when they reach 10; team sizes up to 100 or 150 can be very effective – if you can create a sense of mutual obligation among the team members.

There are, of course, a few things that need to be in place before mutual commitment can happen. First of all, team members must know each other – well. So this won’t work if you constantly reform teams. In addition to knowing each other’s names, teammates must understand the capabilities of their colleagues on the team, have the capacity to make reliable commitments, and be able to trust that their teammates will meet their commitments. This process of creating mutual obligations actually works best if there is no manager brokering commitments, because then the commitments are made to the manager, not to teammates. Instead, a leader’s role is to lay out the overall objectives, clarify the constraints, and create the environment in which reliable commitments are exchanged.

For example, the project manager of the hardware/software product (above) laid out a series of increasingly sophisticated prototypes scheduled about three months apart. Having made a commitment to the team, sub-teams organized their work so as to have something appropriate ready at each prototype deadline. When an opportunity to dramatically improve the product through incorporation of a new chip, the whole team was in a position to rapidly re-think what needed to be done and commit to the new goal.

In the case of lean construction (above), a large team of contractor representatives works out the details of a “schedule” every few months. Each week, the same team gets together and re-thinks how that “schedule” will have to be adapted to fit current reality. At that same weekly meeting, team members commit to each other what they will actually accomplish in the next week, which gives their colleagues a week to plan work crews, material arrival, and so on for the following week.

It certainly is a good idea to have small sub-teams whose members work closely together on focused technical problems, coordinating their work with brief daily meetings to touch base and make sure they are on track to meet their commitments. But the manner in which these sub-teams arrive at those commitments is open for re-thinking. It may be better to leverage thousands of years of human evolution and create an environment whereby people know each other and make mutual commitments to meet the critical goals of the larger community. After all, that’s the way most things got accomplished before there was management.

_________________________________
Footnotes:
[1] Technically, Dunbar calculated the relative sizes of the neocortex – the outer surface of the brain responsible for conscious thinking. For a humorous parody of Dunbar's theory, see "What is the Monkeysphere?" by David Wong.

[2] Information in this paragraph is from: How Many Friends Does One Person Need? by Robin Dunbar.

[3] See John Sculley On Steve Jobs.

[4] This figure from “The Dunbar Number as a Limit to Group Sizes” is antidotal.

[5] From How Many Friends Does One Person Need? by Robin Dunbar. Interestingly, while Dunbar finds 15 an approximate limit of the second circle of intimacy, Allen finds a group of 15 problematic.

[6] The Dunbar Number was popularized by Malcolm Gladwell in Tipping Point. Much information and both quotes in this section are from Chapter 5 of that book. See http://nextreformation.com/wp-admin/general/tipping.htm for an extended excerpt.

May 27, 2007

Bringing Lean to Software Development

Software is not about making something, it’s about making something work. Take software out of a cell phone, a car, a factory, a business, and it won’t work anymore. Software is the brains behind just about everything complicated that we try to do.

In 1960, J.C.R. Licklider, the visionary behind the Internet, wrote: “The main aims [of software] are 1) to let computers facilitate formulative thinking as they now facilitate the solution of formulated problems, and 2) to enable men and computers to cooperate in making decisions and controlling complex situations without inflexible dependence on predetermined programs.”[1] In 1962, Licklider articulated his vision of an “intergalactic network” connecting everyone in the world.[2] Throughout his life, Licklider could be found in a leadership role in one of the organizations that worked to convert his vision into reality: Bolt Beranek and Newman(BBN), ARPA, IBM Research, MIT. He died in 1990, just as the ideas he championed finally grew into the Internet.

If we look at the Internet through Licklider’s eyes, we see the real purpose of software – it does the routine thinking for us so that we can turn our minds to more complex problems. If we look at the evolution of the Internet, we see what developing software is really all about. At its core, software development is the process of gradually finding ways to turn over more and more of what we know to computers so that we have more space left in our minds to discover ever more interesting things.

The Truck-Driving Problem
Imagine that you are responsible for driving a truck across America, along highways, through cities and around detours, dealing with whatever idiosyncrasies that weather and traffic might throw at you. Now imagine that your job is not to drive the truck, but program a computer to drive the truck for you. How would you go about this task?

Many people – especially those who have never built software – would break this problem into a series of steps: first design the logic of the system; second, translate that logic into code; and finally, add the code to the truck and test that it works. But you can imagine that a problem as complex as the truck-driving problem is far too complex to solve with this approach. Instead, the problem is being tackled over time with a lot of experimentation and testing, one module at a time. Today we have laser following cruise control and tomorrow we will have lane following capability. Soon we might expect congestion detectors and GPS guidance. Someday the truck-driving problem might be solved, but by the time it is, the system will no doubt be a lot different than what we imagine today.

Conventional Wisdom
Unfortunately, it has been conventional wisdom in software development to separate design from coding, coding from testing, and software from the system it supports. This gives us development processes that ignore the learning loops necessary to discover the logic of a complex system, create concrete representations of the system, make sure that these work together, and over time, grow a system that becomes capable of accomplishing the complete job. In software development, we have been asked to solve too many truck-driving problems. And when it turns out that we have been handed an impossible problem, it’s usually the developers – not the process or the scale of the problem – that are held responsible for the failure.

When I was an IT manager in a manufacturing plant in the early 1980’s, we discovered that the conventional wisdom about the way that manufacturing should be done had become obsolete. We figured this out because our competitors in Japan started doing things that produced far better results than we were able to achieve. In response to this serious competitive threat, we threw out conventional wisdom and decided to try the counterintuitive approach being used in Japan, called “Just-in-Time.” As a management team, we came to agree on a few basic principles and enlisted the wisdom of everyone in the plant to figure out how to make these principles work in practice. Indeed, it took some time and a lot of hard work to implement Just-in-Time in our plant. As part of the effort, we completely changed the way we thought about quality and used statistics to gain a deeper insight into how our equipment worked. Slowly, it seemed to us, we got better. In retrospect, the improvement was dramatic, but it certainly didn’t feel like it at the time.

Today, the name “Just-in-Time” has been replaced with “Lean,” but to me it remains largely about the same thing: abandoning conventional wisdom that has become obsolete and moving on to a new way of thinking. The transformation will be multifaceted, principle-based, and entail a lot of very hard work by everyone, workers and managers alike. And – probably – it will only happen if there is something that shakes people up enough to cause them to abandon conventional wisdom and look for a new way of thinking about how to do their job.

Analogies
For those who look upon Lean as a set of operational practices, it doesn’t make sense to apply Lean to software development. Inventory, motion, variation, overproduction – the wastes of an operational process – don’t translate easily to the job of creating the brains of a system and making it smarter it over time. In fact, software development has long been plagued by inappropriate comparisons with other fields. Too often, analogies are created by someone who has only a passing acquaintance with a field. For example, someone who knows little about construction might say: “Buildings are completely designed before construction starts – if it works for buildings, why can’t it work for software?” I once discussed this analogy with a group of construction superintendants, who just about laughed me out of the room. They live in a world of incomplete and conflicting drawings, master schedules that bear no resemblance to reality, owners who regularly change their minds, and the constant threat of lawsuits.

Manufacturing analogies have been foisted upon software development by those who think that “cutting code” is pretty much the same thing as cutting metal. It’s painful to imagine the damage that has been done to software development by the manufacturing slogan “Do it Right the First Time.” I often wonder how this slogan came to mean that code should never have to be changed once it is committed to the code base. In our plant, product specs and manufacturing processes changed all the time; we just tested a product after each tiny step to be sure that no defects had appeared. Declaring that we should not have to change code once it is written is like decreeing that once we start our truck out across the country we should never have to change the planned route, no matter what detours or bad weather or flat tires we might encounter along the way.

I was only vaguely aware of the dangers of analogies when I set out to compare Lean software development to Lean manufacturing. I like using analogies – consider the truck-driving problem for example. I think of analogies as tools to help us understand and agree upon principles; but they should never be used as implementation guidelines. Copying specific practices from another field – or even from another company in our field – is a lazy way to implement change. First class execution is possible only when teams carefully think through the principles behind new ideas, understand how these principles apply to their world, and carefully adapt specific practices so that they make sense in the new context.

Paradigm Shift
I didn’t run into the term “waterfall” until 1999, and when I learned what it meant, I did not understand how it could possibly work. Therefore I was not surprised to discover that “waterfall” processes really don’t work – what surprised me was the fact that conventional wisdom held that they should work. I decided that the time had come for a paradigm shift in software development, similar to the paradigm shift that manufacturing experienced during the 1980’s and early 90’s.

Paradigm shifts require that someone with a clear understanding of a core problem in a particular field demonstrate a new and significantly better way to address this core problem. There’s no question in my mind that in manufacturing, the core problem was push scheduling – at least it certainly was in our plant. Simply implementing an effective pull system drove all sorts of other good behavior, and led eventually to significant cost reductions. We decommissioned a lot of software when we implemented our pull system, because the logic of our existing scheduling system was fundamentally flawed.

In that 1999 waterfall project, the core problem I experienced was the idea that development should be a series of handoffs: Analysis, Design, Coding, Testing, Deployment. The problem wasn’t that these steps were unimportant, but that each step was supposed to be completed before the next step began – and since the next step would be done by a different group of people, the handoff had to be done through documentation. The counterintuitive concept in Lean software development is to turn this process on its side and deploy completely done software in small increments. Let’s not even try to develop a system that will drive a truck, let’s see if it is possible to add some intelligence to cruise control and get that working while there is still a driver behind the wheel. Of course this means we are not sure how a fully automated truck will work, when it might be ready or how much it might cost. But if we keep the ultimate goal of an automated truck in mind and design our laser following cruise control wisely, we will be a step closer to a self-driving truck.

It might seem obvious that a completely automated truck is far too ambitious an undertaking, so splitting it up into incremental steps is the best way to make progress. What is counterintuitive is that this approach should scale downward. But it does. And if you look at any really successful complex system, this is the way it was developed. Lean development requires a visionary leader and a sponsor willing to fund the vision rather than a promise that is unlikely to be kept. However, such a sponsor can be hard to find; sponsors always seem to want a “plan.”
 
The “Plan”
The core problem in software development can be boiled down to the intense pressure for a “plan” that lays out what the software will be able to do, how long it will take, and what it will cost – and the subsequent expectation that development will follow this “plan”. The problem is magnified when the software is expected to be developed independently from the system for which the software will supply the brains. Why is planning a problem? Isn’t a plan essential? As Dwight Eisenhower once said: planning is indispensable, but plans are useless.

The problem with software is that the logic behind any system is inherently complex, and developing that logic independently from the system increases the complexity by at least an order of magnitude. As Fred Brooks once noted, “The complexity of software is an essential property… Many of the classical problems of developing software products derive from this essential complexity and its nonlinear increase with size.”[3] Trying to plan a large software development effort is not much different than trying to plan the development of a software package to drive a truck across America – without access to the truck.

You might notice that the core problem of software development is beginning to bear some resemblance to the core problem of manufacturing – we suffer from push scheduling in manufacturing and push planning in software development. But the antidote is somewhat different. In manufacturing, switching from push to pull scheduling gives dramatic results. In software development, switching from forecast-driven to feedback-driven development gives equally dramatic results.

The Antidote
Embedded in every development “plan” is a forecast – a guess really – of what will happen in the future. Plans that separate the logic of a system from the system itself are based on an additional layer of guessing – ahem – forecasting. If we base the development of a complex system on forecasts, we are doing forecast-driven development. If we develop and deploy small useful feature sets and get them working incrementally, then we are doing feedback-driven development. For simple systems, either approach will work. For large, complex or evolving systems, the only feasible approach is feedback-driven development.

There is a great appetite for predictability in any business that has to answer to shareholders or any organization that is under public scrutiny. This is entirely appropriate. However, the idea that predictability comes from creating a plan and then following the plan is fundamentally flawed when complex systems are involved. Following a plan will create predictability only to the extent that the plan is based on an accurate forecast of the future and a thorough understanding of the complexity of the system to be developed. Since I am a process control engineer, I would like to call to your attention something we learned a long time ago: When you really need predictability, you create a feedback system that can respond to change as it occurs, rather than a predictive system that is incapable of dealing with variation.

Many people are concerned about feedback-driven development – it seems to imply a lack of control. But when we are trying to create the brains behind a system, control is hardly what it is all about. The vision behind the Internet had nothing to do with control – and everything to do with finding ways for people to communicate and think more effectively. It took decades of detailed work engaging great minds from around the world for the Internet to become a reality, and it will continue to emerge for decades to come. This great network of software started with a vision and grew with careful guidance, detailed technical work, and extensive collaboration. If you want to understand how Lean software development works, you need look no further.


References and Notes
[1]Licklider, L.C.R. (1960). "Man-Computer Symbiosis" IRE Transactions on Human Factors in Electronics, v.HFE-1. p.4-11.

[2] This was described in a series of memos by Licklider.

[3] The Mythical Man Month, 20th Anniversary Edition, by Fred P. Brooks, Jr., Addison Wesley,1995.

January 6, 2003

Lessons from Planned Economies

Just as a market economy which relies on the collective actions of intelligent agents gives superior performance in a complex and changing economic environment, so too an agile project leadership approach which leverages the collective intelligence of a development team will give superior performance in a complex and changing business environment. However, conventional project management training focuses on using a plan as the program for action; it does not teach project leaders how to create a software development environment that fosters self-organization and learning. Since very few courses with such a focus are available today, this paper proposes a curriculum for agile software development leaders.

Planned Economies
In the middle of the 20th century, dozens of countries and millions of people believed that central planning was the best way to run their economies. Even today there are many people who can’t quite understand why market economies invariably outperform planned economies; it would seem that at least some of the planned economies should have flourished. After all, there are advantages to centralizing economic decisions: virtually full employment is possible; income can be distributed more equally; central coordination should be more efficient; directing resources into investment should spur growth. So why did planned economies fail?

There are two fundamental problems with planned economies: First, in a complex and changing economic system, it is impossible to plan for everything, so a lot of things fall between the cracks. For instance, planned economies usually suffer a shortage of spare parts, because no one plans for machines to break down. Secondary effects such as environmental impact are often ignored. Furthermore, planners do not have control of the purchase of goods, so they have to guess what consumers really want. Inaccurate forecasts are amplified by a long planning cycle, causing chronic shortages and surpluses.

The second problem with planned economies is diminished incentives for individuals. When compensation does not depend on contribution, there is little to gain from working hard. When incentives are tied to meeting targets, risk adverse managers focus on routine production to meet goals. The stronger that rewards are tied to meeting targets, the more disincentive there is for being creative or catching the things that fall between the cracks.

If we look at conventional software project management, we see practices similar to those used in planned economies, and we also see the similar results. Among projects over $3 million, less than 10% meet the conventional definition of success: on time, on budget, on scope. For projects over $6 million the number drops below 1% [1]. Interestingly, the underlying causes of failure of planned economies are the same things that cause failure in software projects, and further, the remedy is similar in both cases.

The difference between a planned and a market economy is rooted in two different management philosophies: management-as-planning/adhering and management-as-organizing/learning. Management-as-planning/adhering focuses on creating a plan that becomes a blueprint for action, then managing implementation by measuring adherence to the plan. Management-as-organizing/learning focuses on organizing work so that intelligent agents know what to do by looking at the work itself, and improve upon their implementation through a learning process.

The Planning/Adhering Model Of Project Management
Conventional wisdom holds that managing software projects is equivalent to meeting pre-planned cost, schedule and scope targets. The unquestioned dominance of cost, schedule and scope – often to the exclusion of less tangible factors such as usability or realization of purpose – draws heavily on the contract administration roots of project management. Therefore project management training and certification programs tend to focus on the management-as-planning/adherence philosophy. This philosophy has become entrenched because it seems to address two fears: a fear of scope-creep, and a fear that the cost of changes escalates significantly as development progresses.

However, management-as-planning/adherence leads to the same problems with software projects that planned economies suffered: in a complex and changing environment, it is virtually impossible for the plan to cover everything, and measuring adherence to the plan diminishes incentives for creativity and catching the things that fall between the cracks.

In the classic article ‘Managing by Whose Objectives?,’[4] Harry Levinson suggests that the biggest problem with management-by-objectives is that important intangibles which are not measurable fail to get addressed, because they are not in the action plan of any managers. Often these are secondary ‘hygiene’ factors, similar to environmental considerations in a planned economy.

In the book ‘Measuring and Managing Performance in Organizations’[5], Robert Austin makes the same point: over time, people will optimize what is measured and rewarded. Anything which is not part of the measurement plan will fade from importance. Austin points out that managers are often uncomfortable with the idea of not being able to measure everything, so they compensate through one of three techniques:
  • Standardization. By creating standards for each step in a development process, it is hoped that all steps in the project can be planned and measured, and nothing will be missed.
  • Specification. Specification involves constructing a detailed model of the product and/or process and planning every step in detail.
  • Subdivision, functional decomposition. The Work Breakdown Structure (WBS) is the classic example of attempts to decompose a project into steps so that all steps can be planned. 
Conventional project management practices have emphasized all of these techniques to help a project manager be certain that everything is covered in the project plan. However, just as in a planned economy, these techniques are insufficient to catch everything in all but the simplest of projects. In fact, drilling down to detail early in the project has the opposite effect – it tends to create blind spots, not resolve them. By taking a depth-first rather than a breadth-first approach to planning, mistakes and omissions become more likely,[6] and these tend to be more costly because of early investment in details. Thus an early drill-down approach tends to amplify, not reduce, the cost of change.

A management-as-planning/adherence approach also tends to amplify, not reduce, scope-creep. In many software development projects, a majority of the features are seldom or never used.[1] Part of the reason for this is that asking clients at the beginning of a project what features they want, and then preventing them from changing their minds later, creates strong incentives to increase the number of features requested, just in case they are needed. While limiting scope usually provides the best opportunity for reducing software development costs, fixing scope early and controlling it rigidly tends to expand, not reduce scope.

Just as in planned economies, management-as-planning/adhering tends to have unintended consequences that produce precisely the undesirable results that the plans were supposed to prevent. The problem lies not in the planning, which is very useful, but in using the plan as a roadmap for action and measuring performance against the plan.

The Organizing/Learning Model Of Project Management
Market economies deal with the problems of planned economies by depending upon collaborating intelligent agents to make decisions within an economic framework. In market economies, it is the job of the government to organize the economic framework with such things as anti-trust laws and social safety nets. Economic activity is conducted by intelligent agents who learn from experience what is needed and how to fill the needs.

Of course, the economies of individual countries dwarf most software projects, so we might look further to find examples of management-as-organizing/learning. We will explore two domains: manufacturing and product development.

Throughout most of the 20th century, mass production in the US focused on getting things done through central planning and control, reflecting the strong influence of Frederick Taylor’s Scientific Management. The climax came when computer systems made it possible to plan the exact movement of materials and work throughout a plant. Material Requirements Planning (MRP) systems were widely expected to increase manufacturing efficiency in the 1980’s, but in fact, most MRP systems were a failure at detailed production planning. They failed for the same reasons that planned economies failed: the systems could not readily adapt to slight variations in demand or productivity. Thus they created unworkable schedules, which had to be ignored, causing the systems to become ever more unrealistic.

As the centralized MRP planning systems were failing, Just-in-Time systems appeared as a counterpoint to Scientific Management. Just-in-Time forsakes central planning in favor of collaborating teams (intelligent agents). The environment is organized in such a way that the work itself and the neighboring teams signal what needs to be done; rather than a central plan. When problems occur, the root cause is sought out and eliminated, creating an environment in which intelligent agents continually improve the overall system. In almost all manufacturing environments, implementing Just-in-Time trumps any attempt to plan detailed production activities using a MRP system. These systems succeed for the same reason a market economy succeeds: intelligent agents are better at filling in the gaps and adapting to variation than a centrally planned system.

An argument can be made that manufacturing analogies are not appropriate for software development, because manufacturing is repetitive, while projects deal with unique situations. Because of this uniqueness, the argument goes, management as planning/ adhering is the only way to maintain control a design and development environment. A look at product development practices shows that the opposite is true: creating a detailed plan and measuring adherence to that plan is actually a rather ineffective approach a complex product development project.

In the late 1980’s Detroit was shocked to discover that a typical Japanese automotive company could develop a new car in 2/3’s the time for half the cost as a typical US automaker.[7] The difference was that product development in Japan used a concurrent development process, which allows for learning cycles during the design process as well as on-going communication and negotiation among intelligent agents as design proceeds.

Just as market economies routinely outperform planned economies, concurrent development routinely outperforms sequential development. Replacing sequential (plan-up-front) engineering with concurrent (plan-as-you-go) engineering has been credited with reducing product development time by 30-70%, engineering changes by 65-90%, and time to market by 20-90%, while improving quality by 200-600%, and productivity by 20-110%.[8]

Based on experience from other domains, management-as-organizing/learning would appear to have a better chance of resulting successful software projects than the prevailing management-as-planning/adhering approach. An examination of the Agile Manifesto shows that agile software development approaches favor the management-as-organizing/learning philosophy. (See Table 1.) Therefore, we can expect that in the long run, agile software development might significantly outperform traditional software development practices. In fact, evidence is mounting that agile approaches can be very effective. [9]

Table 1. Mapping Values from the Agile Manifesto to Management Philosophies

A Curriculum For Agile Software Project Leadership
Existing training for project management appears to be largely focused on the management-as-planning/adhering philosophy. Courses seem to be aimed at obtaining certification in an approach to project management developed for other domains, such as facilities construction or military procurement. Even courses aimed specifically at software development tend to focus on work breakdown and a front-end-loaded approach to managing scope. As we have seen, this is not a good match for concurrent development or agile software development.

It would seem that at a curriculum should be available for leaders of agile software development projects, given the dismal track record of current approaches and the potential of agile software development. Project managers who know how to develop work breakdown structures and measure earned value often wonder what to do with an agile software development project. Senior managers often wonder how to improve the skills of project leaders. Courses on management-as-organizing/learning are needed to fill this void, but there seem to be few project management courses with this focus. To help make agile project leadership training more widely available, this article outlines a possible curriculum for such courses.

Change the Name: Project Leadership
Since this is new territory, we may as well start with a new name, and move away from the administrative context of the word management. All projects, agile or otherwise, benefit from good leaders; that is, people who set direction, align people, and create a motivating environment. By using the term leadership we distinguish this course from one which focuses on the management tasks of planning, budgeting, staffing, tracking, and controlling.

Setting Direction
Planning is a good thing; the ultimate success of any project depends upon the people who implement a project understanding what constitutes success. Planning becomes brittle with it decomposes the problem too fast and moves too quickly to solutions. The best approach to early planning is to move up one notch and take a broader view, rather than decompose the problem and commit to detail too early.[6] A project leader starts by understanding the purpose of the project and keeping that purpose in front of the development team at all times.

Organizing Through Iterations
The idea of management-as-organizing/learning is to structure the work so that developers can figure out what to do from the work itself. The fundamental tool for doing this is short iterations which develop working software delivering business value. Project leaders need to know how to organize iteration planning meetings and how to structure the development environment and workday so that people know what to do when they come in to work every day, without being told.

This part of the curriculum must cover such concepts as story cards, backlog lists, daily meetings, pair programming, and information radiators. It should also stress the importance of organizing worker-to-worker collaboration between those who understand what the system must do to provide value and those who understand what the code does.

Concurrent Development
Strategies for concurrent development are an important tool for project leaders, especially in organizations which are used to sequential development. General strategies include:
  • sharing partially complete design information
  • communicating design constraints instead of proposed solutions
  • maintaining multiple options
  • avoiding extra features
  • developing a sense of how to absorb changes
  • developing a sense of what is critically important in the domain
  • developing a sense of when decisions must be made
  • delaying decisions until they must be made
  • developing a quick response capability
System Integrity
Project leaders must assure that the software developed under their guidance has integrity. This starts with assuring that the basic tools are in place for good software development: version control, a build process, automated testing, naming conventions, software standards, etc. Leaders must assure that the development team is guided by the true voice of the customer, so that the resulting system delivers value both initially and over time. They must assure that technical leadership establishes the basis of a sound architecture and an effective interface. They must make sure that comprehensive tests are used to provide immediate feedback, as well a framework so that refactoring can safely take place.

Leading Teams
People with experience in traditional project management who are about to lead agile software development projects might need some coaching in how to encourage a team make its own commitments, estimate its own work, and self-organize around iteration goals. Project leaders attend the daily meetings, listen to and solve team problems, serve as an intermediary between management and the team, secure necessary resources and technical expertise, resolve conflicts and keep everyone working together effectively; but they do not tell developers how to do their job. Project leaders coordinate the end-of iteration demonstration and the beginning of iteration planning, making sure that work is properly prioritized and all stakeholder interests are served.

Measurements
Feature lists or release plans, along with associated effort estimates, are often developed early in an agile project. The difference from traditional project management occurs when actual measurements begin to vary from these plans; for agile development, it is assumed that the plan is in error, and needs to be revised. By measuring the actual velocity or burndown rate, a far better picture of project health can be obtained than measuring variance from a guesstimate. Creating more accurate estimates becomes easier as developers gain experience in a domain and customers see working software. Leaders should learn how to combine reports of actual progress with increasingly accurate estimates into a tool for negotiating the scope of a project; this can be far more effective at limiting scope that the traditional method of fixing scope and controlling it with change approval mechanisms.

A useful technique for project leaders is to aggregate all measurements one level higher than normal.[5] This encourages collaboration and knowledge sharing because issues are called to the attention of a larger group of people. It also helps to avoid local optimization and the dangers of individual performance measurements. This technique is useful, for instance, for defect measurements.

Large Projects
Various techniques for synchronizing agile development across multiple teams are important for project managers to understand. Some of the techniques that might be covered are: divisible architectures, daily build and smoke test, spanning applications, loosely coupled teams that develop interfaces before modules.

Conclusion
We have often heard that the sequential, or waterfall, approach to software development projects is widely known to be ineffective, but it seems to be quite difficult to do things differently. We also heard that many, many features in most systems, possibly even a majority, are not needed or used; yet limiting scope to what is necessary seems to be an intractable problem. One solution to these problems can be found in concurrent engineering, which is widely used in product development as an alternative to sequential development. Concurrent engineering works more or less like a market economy: both depend on collaborating intelligent agents, both allow the end result emerge through communication, and both provide incentives for individuals to be creative and do everything necessary to achieve success.
_______________
References:
[1] Johnson, Jim, Chairman of The Standish Group, Keynote “ROI, It’s Your Job,” Third International Conference on Extreme Programming, Alghero, Italy, May, 26-29, 2002.

[2] Johnston, R B, and Brennan, M, “Planning or Organizing: the Implications of Theories of Activity for Management of Operations, Omega: The International Journal of Management Science, Vol 24 no. 4 pp. 367-384, Elsevier Science, 1996.

[3] Koskela1, Lauri, “On New Footnotes to Shingo”, 9th International Group for
Lean Construction Conference, Singapore, August, 6-8 2001.

[4] Levinson, Harry, “Management by Whose Objectives?” Harvard Business Review, Vol 81, no 1, January, 2003, Reprint of 1970 article.

[5] Austin, Robert D., Measuring and Managing Performance in Organizations, 1996, Dorset Publishing House

[6] Thimbleby, Harold, “Delaying Commitment”, IEEE Software, vol 5, no 3, May, 1988

[7] Clark, Kim B, Fujimoto, Takahiro, Product Development Performance; Strategy, Organization, and Management in the World Auto Industry, Harvard Business School Press, Boston, 1991.

[8] Thomas Group Inc., National Institute of Standards & Technology Institute for Defense Analyses, from Business Week, April 30, 1990, pp 111

[9] Weber Morales, Alexandra, “Extreme Quality”, Software Development, Volume 11, No 2, February 2003.

[10] Kotter, John P, “What Leaders Really Do,” Harvard Business Review, Vol 79, no 11, December, 2001, Reprint of 1990 article.

Screen Beans Art, © A Bit Better Corporation

March 5, 2002

Lean Construction

“What are you doing here?”  they asked.

They were construction foremen, superintendents and project managers attending a course in construction planning from the Lean Construction Institute (LCI).  Indeed, what was I doing there?

I started to explain:  “In software development, we are told we should manage our projects like construction projects, where a building is designed at the start, cost and schedule are predictable, and customers get what they expect.”

Silence.  “You’re kidding, right?”  “No, honest, that’s what we’re told.”

Incredulity turns to laughter.  The idea that programmers would want to manage projects like the construction industry strikes my classmates as ludicrous.

They struggle every day with a master schedule which bears little relationship to reality, with materials that should be on site but are not, or materials that need to be stored because they arrived before they were needed.  The never know when the crew that precedes them will be ready to turn an area over to them, so they never know how to staff their crews.  They are plagued constantly by the two biggest forms of construction waste – people waiting for materials and work waiting for people.

Construction might be thought of as a long series of handoffs between trades.  When building a house, there maybe 165 handoffs.  Every handoff introduces an element of variability.  Add to this the variability introduced by weather, staging material, finding tools, sharing equipment, and wide variation from the master schedule is a simple matter of statistics.

In manufacturing, MRP systems are known to produce wide swings in plans when adjusting for small variations in production, which makes them relatively useless for detailed shop floor planning.   For the same reason, the construction industry has found a master schedule to be a relatively useless technique for detailed construction planning.  These are open loop control systems which are being incorrectly applied to planning a variable system, which needs to be controlled by a closed loop system.

The Lean Construction Institute teaches construction superintendents, foremen, and project managers to plan work in three windows:  a phase window of three months or so, a six week look-ahead window which rolls weekly, and a detailed plan for the next week.

The phase plan is the point at which major plans for how work is done will be devised.  The level of pre-fabrication of building elements, the sequence of construction events, and the need for long lead time items are addressed.  The phase is planned backward in a ‘pull’ method; that is, the plan starts from the completed set of work and moves backward to lay out what needs to be done to get there.

Each week a new week rolls off the phase plan and onto the six week (or thereabouts)  look-ahead plan.  Each week the construction superintendents and foremen (called ‘Last Planners’ by LCI) review the look-ahead plan to assure that as work becomes due, the necessary materials are at hand and all pre-work is completed.  Every effort is made to assure that most material ordering and preparation work can be done within the look-ahead window, so keeping an eye on the next six weeks gives adequate time to be sure everything is in place when it comes time to do the work.

Each week the ‘Last Planner’ team commits to the plan for the following week.   The most important thing that they learn in the LCI class is to commit only to what should be done and can be done.  Once the commitment is made, each crew is expected to meet its commitment, and success is the measured in terms of meeting the weekly promises.

The ‘Last Planner’ system taught by LCI greatly reduces variability in construction planning, because it is a closed loop control system.  Work is not planned by the master schedule, but by real people (‘Last Planners’) who make detailed short term plans based on what material is actually available, what the near term weather forecasts say, whether the previous crew can be trusted to be done, what crew members are available for the job, etc.  The reliability of these plans has resulted in enormous productivity gains and a significant reduction in construction site problems.

What Does This Have To Do With Software?
Software developers don’t think of their work as a series of handoffs between trades, because often projects are broken into small segments and a single team is assigned to develop each segment.  In this environment, daily builds and automated tests are often used to integrate new code, assuring that teams do not interfere with each other’s work.

However, there are a lot of handoffs in software development.  Trace the path of requirements as they move from customer to developer, and count the handoffs.

As I sat in the construction class, I was surprised at how much design work goes on during construction.  You might think that once construction drawings and specs are approved, the design would be complete.  You would be wrong.  Here are some typical examples of things that happen every day in construction:

Example One:  “What’s that cloud in the basement drawing?  Oh!  It’s an elevator shaft that hasn’t been specified.  But we are about to pour concrete!  Call the architect!”

Example Two:  “How is this conference room going to be furnished?  The electrician has to decide how to lay out the lighting and where to put the outlets.  Someone needs to let us know where the phone and Ethernet terminations go.  Call the customer.”


Example Three:  “The hospital has hired a new head surgeon and he wants the surgical area to be laid out differently.  He says technology has changed in the two years since the drawings were approved and the layout in the drawings is completely out of date.”

In my construction class, the idea of “freeze the design” meets the same fate as “follow the master schedule.”  Laughter.  Not only is freezing the design impossible, but given the long building times in construction, attempting to do so is sure to make the real customer – the people who move into the building – unhappy with the result.

Instead, design is just another element of the ‘Last Planner’ system.  During the look-ahead period, incomplete designs are identified and arrangements are made to fill in the blanks.  In the same way that lack of materials is the biggest cause of construction delay, lack of requirements is the biggest cause of design delay.  The ‘Last Planner’ system pulls in requirements just as it pulls in materials, and LCI recognizes that designs done as late as possible are often the best.  In fact, they recommend that design decisions be made at the ‘Last Responsible Moment’ even as materials arrive ‘Just in Time’. 

The ‘Last Planner’ system creates commitments between workers on what will happen next week, while looking out six weeks to assure that everything will be in place for work that should happen in the near future.  Most planning systems are directive, but this planning system is collaborative.  In a weekly meeting that lasts less than an hour, the ‘Last Planners’ – foremen, crew chief, superintendents, designers – commit to each other and then make good on those commitments.  The system adapts each week for variations such as delayed material or bad weather or changing customer requirements.

The Problem With Task-based Planning
At a construction site, various trades typically work separately on tasks specified in and coordinated by the master schedule.  But this doesn’t give them any incentive to work together, nor does it provide for much planning on the best way to deliver a feature.  At the LCI class I learned that significant gains can be achieved by looking at a construction project as delivering a set of features, rather than accomplishing a set of isolated tasks.

Case One:  The hallway wall of a prison cell is typically pre-fabricated and set in place, then cement is poured, and much later doors are added.  The problem is, if the cement is just a bit too high, the doors don't close.  In one prison, fully a third of the doors had to be ground to fit. On a recent prison project, the management firm (one of LCI’s best customers) suggested that the wall pre-fabricator add the door to the pre-fabrication process.  This was unheard-of, because it involved the coordination of two trades that did work in very different phases of the project.  Upon investigation, the idea was found to be not only possible, but in the end it saved a large chunk of money.  Better still, the new approach is saving more money on each new project.

Case Two:  In building a parking structure, materials for beams were lifted by the crane onto each floor and assembled in place.  Then the crew assembling the beams was released while the next floor was prepared for beams.  The boom and bust cycle of employment created a problem in retaining good crews to work on the beams.  LCI suggested that the beams be assembled on the ground and lifted into place by the cranes, creating steady work for a smaller crew which would assemble the beams as well as for the crew adding the next floor.  It was tricky to work out the crane’s schedule, because typically it is released to only one crew at a time and the fact that it was used only one third of the time was not immediately apparent.  However, the change was made and site productivity increased dramatically thereafter.

Case Three:  One of LCI’s best customers has moved to feature-based planning from the beginning of a project.  It recently divided a new field house at a university into about a dozen main ‘features’:  practice fields, swimming pool, basketball courts, etc.  Each feature was given an appropriate portion of the budget, and a cross-functional team (including users) is assigned to each feature.  The teams in turn broke their features down into sub-features and decided how to spend their allotted money.  Sometimes they negotiated with other feature teams for more of the budget.  As the building went up, the feature teams made decisions which kept their portion under budget.  The result was a smooth construction cycle with a minimum of changes, and a very satisfied customer.

The lesson for software development is that planning in terms of features rather than tasks can yield tremendous advantages.  The Work Breakdown Structure (WBS) method of project planning, with its emphasis on managing individual tasks, leads to sub-optimized thinking which does not correct itself, even when a more effective approach is begging to be discovered.

The Contract Environment
Greg Howell of the Lean Construction Institute told me that construction companies used to be vertically integrated.  But as time went on, tasks became segregated and associated costs identified, leading construction companies to sub-contract the cost and risk of various activities.  In a sub-contracting environment, Greg pointed out, responsibility is shifted to the sub-contractor.  The project manager assigns work, but is not responsible for it. Integrating across the trades is not really anyone’s job.

Typically there is a design firm and a construction firm under contract for any job; however, this has led to countless disagreements, finger-pointing, and even lawsuits.  Recently a practice called design-build has become popular, where the design firm is also responsible for construction.  This has created an environment where more responsibility lies with a single firm, which often leads to greater speed and productivity.  However, not all design-build arrangements guarantee that work will be coordinated across sub-contractors.  The key, Greg says, is to view construction as an integrated flow, rather than a collection of independent tasks. Companies with this mindset are the ones who come up with the ‘innovative’ ideas in the case studies above.

Lessons For Software Development
If construction projects have predictable costs, schedules and results, there is probably a sizable contingency fund for covering surprises. There is a lot of wasted time and productivity in a typical construction project. This is caused by two things:
  1. An open-loop plan which does not address variation and thus magnifies it.
  2. Fragmentation of responsibility, giving each trade incentives to optimize their individual performance.
Software developers can avoid the open loop planning problem through short cycle, closed loop planning. Various agile practices recommend adopting an iteration cycle of two to six weeks, augmented with daily planning meetings. The important capability is to deliver code which is fully tested and ready for release on a regular, short cycle. This is the essence of closed loop control in software development.

Sub-optimization is caused by rewarding people based on measurements of performance in a narrow area, rather than rewarding people for achieving broader objectives. The fact is, emphasizing cost and schedule control during software development is a contractor mentality, which tends to de-emphasize the importance of achieving overall business objectives. In practice, contracts which are meant to reduce risk often end up reducing responsibility for achieving the business goals instead.

In summary, every metaphor has its limitations, and the construction metaphor is no exception. Metaphors usually suffer when people have an incomplete understanding of the field upon which the metaphor is based. Digging deeper into construction, for example, we find that master schedules are useless for planning work, contracting practices create islands of optimization, and there are large opportunities for productivity improvement. The feature-based planning and short, closed loop cycles of agile software development are similar to the Lean Construction Institute's practices, which have been the source of significant improvements in the construction industry.

Screen Beans Art, © A Bit Better Corporation

March 26, 2001

Theory of Constraints

Two decades ago, Japanese car-makers developed several new manufacturing methods, including 'Just-in-Time'. Based on the theory that most in-process inventory spends most of its time in a buffer, waiting to be processed, Just-in-Time scheduling dramatically reduced inventory, which coincidentally reduced the amount of time it took product to move through a manufacturing plant.

In the 1980's, Dr. Eli Goldratt publicized the Theory of Constraints, which improved upon Just-in-Time methodologies, and in the 1990's, Goldratt adapted the Theory of Constraints to project management in his book "Critical Chain". Based on the idea that individual estimates of project time must be padded to allow for contingencies, Goldratt demonstrated that padded project time operates in the same manner as inventory buffers to delay projects.

It's Okay to be Late
The fundamental concept behind the Theory of Constraints is that elements of a project must be scheduled based on the average time they will take to accomplish, not the maximum time they might take to accomplish. A project buffer is placed at the end of the project, which allows for some activities to be late.

Of course, it's human nature to estimate time based on the worst case scenario, not average time to complete. As soon as people are penalized for estimating average time and then not meeting the estimate, they will revert to estimating the maximum time, and project schedules will again fill up with padded time estimates. Thus, in a project using Theory of Constraints, it is important that it is 'okay' to be late.

It may be hard to buy at first, but even though it's okay for individual elements to be late, Theory of Constraints project management makes it far easier to assure that the overall project is completed on time.

Last Planner

The Lean Construction Institute has developed an effective project management technique for construction called 'Last Planner System'. This is a deceptively simple system which involves having foremen (last planners) planning activities for the immediate future, using only two rules:
  1. If it can't be done, then don't plan to do it.
  2. If you plan to do it, then get it done.
These two simple rules, along with a similar set of rules for the period after the immediate future, have led to enormous productivity increases in construction. For more on this visit the Lean Construction Institute.