January 22, 2016

Five World-Changing Software Innovations

On the 15th anniversary of the Agile Manifesto, let's look at what else was happening while we were focused on spreading the Manifestos ideals. There have been some impressive advances in software technology since Y2K:
          1.   The Cloud
          2.   Big Data
          3.   Antifragile Systems
          4.   Content Platforms
          5.   Mobile Apps 

The Cloud

In 2003 Nicholas Carr’s controversial article “IT Doesn’t Matter” was published in Harvard Business Review. He claimed that “the core functions of IT– data storage, data processing, and data transport” had become commodities, just like electricity, and they no longer provided differentiation. It’s amazing how right – and how wrong – that article turned out to be. At the time, perhaps 70% of an IT budget was allocated to infrastructure, and that infrastructure rarely offered a competitive advantage. On the other hand, since there was nowhere to purchase IT infrastructure as if it were electricity, there was a huge competitive advantage awaiting the company that figured out how package and sell such infrastructure. 

At the time, IT infrastructure was a big problem – especially for rapidly growing companies like Amazon.com. Amazon had started out with the standard enterprise architecture: a big front end coupled to a big back end. But the company was growing much faster than this architecture could support. CEO Jeff Bezos believed that the only way to scale to the level he had in mind was to create small autonomous teams. Thus by 2003, Amazon had restructured its digital organization into small (two-pizza) teams, each with end-to-end responsibility for a service. Individual teams were responsible for their own data, code, infrastructure, reliability, and customer satisfaction.

Amazon’s infrastructure was not set up to deal with the constant demands of multiple small teams, so things got chaotic for the operations department. This led Chris Pinkham, head of Amazon’s global infrastructure, to propose developing a capability that would let teams manage their own infrastructure – a capability that might eventually be sold to outside companies. As the proposal was being considered, Pinkham decided to return to South Africa where he had gone to school, so in 2004 Amazon gave him the funding to hire a team in South Africa and work on his idea. By 2006 the team’s product, Elastic Compute Cloud (EC2), was ready for release. It formed the kernel of what would become Amazon Web Services (AWS), which has since grown into a multi-billion-dollar business.

Amazon has consistently added software services on top of the hardware infrastructure – services like databases, analytics, access control, content delivery, containers, data streaming, and many others. It’s sort of like an IT department in a box, where almost everything you might need is readily available. Of course Amazon isn’t the only cloud company – it has several competitors.

So back to Carr’s article – Does IT matter?  Clearly the portion of a company’s IT that could be provided by AWS or similar cloud services does not provide differentiation, so from a competitive perspective, it doesn’t matter. If a company can’t provide infrastructure that matches the capability, cost, accessibility, reliability, and scalability of the cloud, then it may as well outsource its infrastructure to the cloud.

Outsourcing used to be considered a good cost reduction strategy, but often there was no clear distinction between undifferentiated context (that didn’t matter) and core competencies (that did). So companies frequently outsourced the wrong things – critical capabilities that nurtured innovation and provided competitive advantage. Today it is easier to tell the difference between core and context: if a cloud service provides it then anybody can buy it, so it’s probably context; what’s left is all that's available to provide differentiation. In fact, one reason why “outsourcing” as we once knew it has fallen into disfavor is that today, much of the outsourcing is handled by cloud providers. 

The idea that infrastructure is context and the rest is core helps explain why internet companies do not have IT departments. For the last two decades, technology startups have chosen to divide their businesses along core and infrastructure lines rather than along technology lines. They put differentiating capabilities in the line business units rather than relegating them to cost centers, which generally works a lot better. In fact, many IT organizations might work better if they were split into two sections, one (infrastructure) treated as a commodity and the rest moved into (or changed into) a line organization. 


Big Data

In 2001 Doug Cutting released Lucene, a text indexing and search program, under the Apache software license. Cutting and Mike Cafarella then wrote a web crawler called Nutch to collect interesting data for Lucerne to index. But now they had a problem – the web crawler could index 100 million pages before it filled up the terabyte of data they could easily fit on one machine. At the time, managing large amounts of data across multiple machines was not a solved problem; most large enterprises stored their critical data in a single database running on a very large computer. 

But the web was growing exponentially, and when companies like Google and Yahoo set out to collect all of the information available on the web, currently available computers and databases were not even close to big enough to store and analyze all of that data. So they had to solve the problem of using multiple machines for data storage and analysis. 

One of the bigger problems with using multiple machines is the increased probability that one of machines will fail. Early in its history, Google decided to accept the fact that at its scale, hardware failure was inevitable, so it should be managed rather than avoided. This was accomplished by software which monitored each computer and disk drive in a data center, detected failure, kicked the failed component out of the system, and replaced it with a new component. This process required keeping multiple copies of all data, so when hardware failed the data it held was available in another location. Since recovering from a big failure carried more risk than recovering from a small failure, the data centers were stocked with inexpensive PC components that would experience many small failures. The software needed to detect and quickly recover from these “normal” hardware failures was perfected as the company grew. 

In 2003 Google employees published two seminal papers describing how the company dealt with the massive amounts of data it collected and managed. Web Search for a Planet: The Google Cluster Architecture by Luiz André Barroso, Jeffrey Dean, and Urs Hölzle described how Google managed it’s data centers with their inexpensive components. The Google File System by Sanjay Ghemawat, Howard Gobioff, and Shun-Tak Leung described how the data was managed by dividing it into small chunks and maintaining multiple copies (typically three) of each chunk across the hardware. I remember that my reaction to these papers was “So that’s how they do it!” And I admired Google for sharing these sophisticated technical insights. 

Cutting and Cafarella had approximately the same reaction. Using the Google File System as a model, they spent 2004 working on a distributed file system for Nutch. The system abstracted a cluster of storage into a single file system running on commodity hardware, used relaxed consistency, and hid the complexity of load balancing and failure recovery from users. 

In fall, 2004, the next piece of the puzzle – analyzing massive amounts of stored data – was addressed by another Google paper: MapReduce: Simplified Data Processing on Large Clusters by Jeffrey Dean and Sanjay Ghemawat. Cutting and Cafarella spent 2005 rewriting Nutch and adding MapReduce, which they released as Apache Hadoop in 2006. At the same time, Yahoo decided it needed to develop something like MapReduce, and settled on hiring Cutting and building Apache Hadoop into software that could handle its massive scale. Over the next couple of years, Yahoo devoted a lot of effort to converting Apache Hadoop – open source software – from a system that could handle a few servers to a system capable of dealing with web-scale databases. In the process, their data scientists and business people discovered that Hadoop was as useful for business analysis as it was for web search. 

By 2008, most web scale companies in Silicon Valley – Twitter, Facebook, LinkedIn, etc. – were using Apache Hadoop and contributing their improvements. Then startups like Cloudera were founded to help enterprises use Hadoop to analyze their data. What made Hadoop so attractive? Until that time, useful data had to be structured in a relational database and stored on one computer. Space was limited, so you only kept the current value of any data element. Hadoop could take unlimited quantities of unstructured data stored on multiple servers and make it available for data scientists and software programs to analyze. It was like moving from a small village to a megalopolis – Hadoop opened up a vast array of possibilities that are just beginning to be explored.

In 2011 Yahoo found that its Hadoop engineers were being courted by the emerging Big Data companies, so it spun off Hortonworks to give the Hadoop engineering team their own Big Data startup to grow. By 2012, Apache Hadoop (still open source) had so many data processing appendages built on top of the core software that MapReduce was split off from the underlying distributed file system. The cluster resource management that used to be in MapReduce was replaced by YARN (Yet Another Resource Negotiator). This gave Apache Hadoop another growth spurt, as MapReduce joined a growing number of analytical capabilities that run on top of YARN. Apache Spark is one of those analytical layers which supports data analysis tools that are more sophisticated and easier to use than MapReduce. Machine learning and analytics on data streams are just two of the many capabilities that Spark offers – and there are certainly more Hadoop tools to come. The potential of Big Data is just beginning to be tapped. 

In the early 1990’s Tim Burners Lee worked to ensure that CERN made his underlying code for HTML, HTTP and URL’s available on a royalty free basis, and because of that we have the world wide web. Ever since, software engineers have understood that the most influential technical advances come from sharing ideas across organizations, allowing the best minds in the industry to come together and solve tough technical problems. Big Data is as capable as it is because Google and Yahoo and many others companies were willing to share their technical breakthroughs rather than keep them proprietary. In the software industry we understand that we do far better as individual companies when the industry as a whole experiences major technical advances. 


Antifragile Systems

It used to be considered unavoidable that as software systems grew in age and complexity, they became increasingly fragile. Every new release was accompanied by fear of unintended consequences, which triggered extensive testing and longer periods between releases. However, the “failure is not an option” approach is not viable at internet scale – because things will go wrong in any very large system. Ignoring the possibility of failure – and focusing on trying to prevent it – simply makes the system fragile. When the inevitable failure occurs, a fragile system is likely to break down catastrophically.[1]  

Rather than prevent failure, it is much more important to identify and contain failure, then recover with a minimum of inconvenience for consumers. Every large internet company has figured this out. Amazon, Google, Esty, Facebook, Netflix and many others have written or spoken about their approach to failure. Each of these companies has devoted a lot of effort to creating robust systems that can deal gracefully with unexpected and unpredictable situations.

Perhaps the most striking among these is Netflix, which has a good number of reliability engineers despite the fact that it has no data centers. Netflix’s approach was described in 2013 by Ariel Tseitlin in the article The Antifragile Organization: Embracing Failure to Improve Resilience and Maximize Availability.  The main way Netflix increases the resilience of its systems is by regularly inducing failure with a “Simian Army” of monkeys: Chaos Monkey does some damage twice an hour, Latency Monkey simulates instances that are sick but still working, Conformity Monkey shuts down instances that don’t adhere to best practices, Security Monkey looks for security holes, Janitor Monkey cleans up clutter, Chaos Gorilla simulates failure of an AWS availability zone and Chaos Kong might take a whole Amazon region off line. I was not surprised to hear that during a recent failure of an Amazon region, Netflix customers experienced very little disruption.

A Simian Army isn’t the only way to induce failure. Facebook’s motto “Move Fast and Break Things” is another approach to stressing a system. In 2015, Ben Maurer of Facebook published Fail at Scale – a good summary of how internet companies keep very large systems reliable despite failure induced by constant change, traffic surges, and hardware failures. 

Maurer notes that the primary goal for very large systems is not to prevent failure – this is both impossible and dangerous. The objective is to find the pathologies that amplify failure and keep them from occurring. Facebook has identified three failure-amplifying pathologies: 

1. Rapidly deployed configuration changes
Human error is amplified by rapid changes, but rather than decrease the number of deployments, companies with antifragile systems move small changes through a release pipeline. Here changes are checked for known errors and run in a limited environment. The system quickly reverts to a known good configuration if (when) problems are found. Because the changes are small and gradually introduced into the overall system under constant surveillance, catastrophic failures are unlikely. In fact, the pipeline increases the robustness of the system over time.

2. Hard dependencies on core services
Core services fail just like anything else, so code has to be written with that in mind. Generally hardened API’s that include best practices are used to invoke these services. Core services and their API’s are gradually improved by intentionally injecting failure into a core service to expose weaknesses that are then corrected as failure modes are identified.

3. Increased latency and resource exhaustion
Best practices for avoiding the well-known problem of resource exhaustion include managing server queues wisely and having clients track outstanding requests. It’s not that these strategies are unknown, it’s that they must become common practice for all software engineers in the organization. 

Well-designed dashboards, effective incident response, and after-action reviews that implement countermeasures to prevent re-occurrence round out Facebook's toolkit for keeping its very large systems reliable.

We now know that fault tolerant systems are not only more robust, but also less risky than systems which we attempt to make failure-free. Therefore, common practice for assuring the reliability of large-scale software systems is moving toward software-managed release pipelines which orchestrate frequent small releases, in conjunction with failure induction and incident analysis to produce hardened infrastructure.


Content Platforms

Video is not new; television has been around for a long time, film for even longer. As revolutionary as film and TV have been, they push content to a mass audience; they do not inspire engagement. An early attempt at visual engagement was the PicturePhone of the 1970’s – a textbook example of a technical success and a commercial disaster. They got the PicturePhone use case wrong – not many people really wanted to be seen during a phone call. Videoconferencing did not fare much better – because few people understood that video is not about improving communication, it’s about sharing experience. 

In 2005, amidst a perfect storm of increasing bandwidth, decreasing cost of storage, and emerging video standards, three entrepreneurs – Chad Hurley, Steve Chen, and Jawed Karim – tried out an interesting use case for video: a dating site. But they couldn’t get anyone to submit “dating videos,” so they accepted any videos clips people wanted to upload. They were surprised at the videos they got: interesting experiences, impressive skills, how-to lessons – not what they expected, but at least it was something. The YouTube founders quickly added a search capability. This time they got the use case right and the rest is history. Video is the printing press of experience, and YouTube became the distributor of experience. Today, if you want to learn the latest unicycle tricks or how to get the back seat out of your car, you can find it on YouTube. 

YouTube was not the first successful content platform. Blogs date back to the late 1990’s where they began as diaries on personal web sites shared with friends and family. Then media companies began posting breaking news on their web sites to get their stories out before their competitors. Blogger, one of the earliest blog platforms, was launched just before Y2K and acquired by Google in 2003 – the same year WordPress was launched. As blogging popularity grew over the next few years, the use case shifted from diaries and news articles to ideas and opinions – and blogs increasingly resembled magazine articles. Those short diary entries meant for friends were more like scrapbooks; they came to be called tumbleblogs or microblogs. And – no surprise – separate platforms for these microblogs emerged: Tumblr in 2006 and Twitter in 2007.

One reason why blogs drifted away from diaries and scrapbooks is that alternative platforms emerged aimed at a very similar use case – which came to be called social networking. MySpace was launched in 2003 and became wildly popular over the next few years, only to be overtaken by Facebook, which was launched in 2004. 

Many other public content platforms have come (and gone) over the last decade; after all, a successful platform can usually be turned into a significant revenue stream. But the lessons learned by the founders of those early content platforms remain best practices for two-sided platforms today:

  1. Get the use case right on both sides of the platform. Very few founders got both use cases exactly right to begin with, but the successful ones learned fast and adapted quickly. 
  2. Attract a critical mass to both sides of the platform. Attracting enough traffic to generate network effects requires a dead simple contributor experience and an addictive consumer experience, plus a receptive audience for the initial release.
  3. Take responsibility for content even if you don’t own it. In 2007 YouTube developed ContentID to identify copyrighted audio clips embedded in videos and make it easy for contributors to comply with attribution and licensing requirements. 
  4. Be prepared for and deal effectively with stress. Some of the best antifragile patterns came from platform providers coping with extreme stress such as the massive traffic spikes at Twitter during natural disasters or hectic political events.

In short, successful platforms require insight, flexibility, discipline, and a lot of luck. Of course, this is the formula for most innovation. But don't forget  no matter how good your process is, you still need the luck part. 


Mobile Apps

It’s hard to imagine what life was like without mobile apps, but they did not exist a mere eight years ago. In 2008 both Apple and Google released content platforms that allowed developers to get apps directly into the hands of smart phone owners with very little investment and few intermediaries. By 2014 (give or take a year, depending on whose data you look at) mobile apps had surpassed desktops as the path people take to the internet. It is impossible to ignore the importance of the platforms that make mobile apps possible, or the importance of the paradigm shift those apps have brought about in software engineering. 

Mobile apps tend to be small and focused on doing one thing well – after all, a consumer has to quickly understand what the app does. By and large, mobile apps do not communicate with each other, and when they do it is through a disciplined exchange mediated by the platform. Their relatively small size and isolation make it natural for each individual app to be owned by a single, relatively small team that accepts the responsibility for its success. As we saw earlier, Amazon moved to small autonomous teams a long time ago, but it took a significant architectural shift for those teams to be effective. Mobile apps provide a critical architectural shift that makes small independent teams practical, even in monolithic organizations. And they provide an ecosystem that allows small startups to compete effectively with those organizations.  

The nature of mobile apps changes the software development paradigm in other ways as well. As one bank manager told me, “We did our first mobile app as a project, so we thought that when the app was released, it was done. But every time there was an operating system update, we had to update the app. That was a surprise! There are so many phones to test and new features coming out that our apps are in a constant state of development. There is no such thing as maintenance – or maybe it's all maintenance.”

The small teams, constant updates, and direct access to the deployed app have created a new dynamic in the IT world: software engineers have an immediate connection with the results of their work. App teams can track usage, observe failures and track metrics – then make changes accordingly. More than any other technology, mobile platforms have fostered the growth of small, independent product teams – with end-to-end responsibility  that use short feedback loops to constantly improve their offering. 

Let’s return to luck. If you have a large innovation effort, it probably has a 20% chance of success at best. If you have five small, separate innovation efforts, each with 20% chance of success, you have a much better chance that one of them will succeed – as long as they are truly autonomous and are not tied to an inflexible back end or flawed use case. Mobile apps create an environment where it can be both practical and advisable to break products into small, independent experiments, each owned by its own “full stack” team.[2] The more of these teams you have pursuing interesting ideas, the more likely you are that some of the ideas will become the innovative offerings that propel your company into the future. 


What about “Agile”?

You might notice that “Agile” is not on my list of innovations. And yet, agile values are found in every major software innovation since the Agile Manifesto was articulated in 2001. Agile development does not cause innovation; it is meant to create the conditions necessary for innovation: flexibility and discipline, customer understanding and rapid feedback, small teams with end-to-end responsibility. Agile processes do not manufacture insight and they do not create luck. That is what people do.  
____________________________
Footnotes:
1.    “the problem with artificially suppressed volatility is not just that the system tends to become extremely fragile; it is that, at the same time, it exhibits no visible risks… Such environments eventually experience massive blowups… catching everyone off guard and undoing years of stability or, in almost all cases, ending up far worse than they were in their initial volatile state. Indeed, the longer it takes for the blowup to occur, the worse the resulting harm…”  Antifragile, Nassim Taleb p 106

2.   A full stack team contains all the people necessary to make things happen in not only the full technology stack, but also in the full stack of business capabilities necessary for the team to be successful.

May 27, 2007

Bringing Lean to Software Development

Software is not about making something, it’s about making something work. Take software out of a cell phone, a car, a factory, a business, and it won’t work anymore. Software is the brains behind just about everything complicated that we try to do.

In 1960, J.C.R. Licklider, the visionary behind the Internet, wrote: “The main aims [of software] are 1) to let computers facilitate formulative thinking as they now facilitate the solution of formulated problems, and 2) to enable men and computers to cooperate in making decisions and controlling complex situations without inflexible dependence on predetermined programs.”[1] In 1962, Licklider articulated his vision of an “intergalactic network” connecting everyone in the world.[2] Throughout his life, Licklider could be found in a leadership role in one of the organizations that worked to convert his vision into reality: Bolt Beranek and Newman(BBN), ARPA, IBM Research, MIT. He died in 1990, just as the ideas he championed finally grew into the Internet.

If we look at the Internet through Licklider’s eyes, we see the real purpose of software – it does the routine thinking for us so that we can turn our minds to more complex problems. If we look at the evolution of the Internet, we see what developing software is really all about. At its core, software development is the process of gradually finding ways to turn over more and more of what we know to computers so that we have more space left in our minds to discover ever more interesting things.

The Truck-Driving Problem
Imagine that you are responsible for driving a truck across America, along highways, through cities and around detours, dealing with whatever idiosyncrasies that weather and traffic might throw at you. Now imagine that your job is not to drive the truck, but program a computer to drive the truck for you. How would you go about this task?

Many people – especially those who have never built software – would break this problem into a series of steps: first design the logic of the system; second, translate that logic into code; and finally, add the code to the truck and test that it works. But you can imagine that a problem as complex as the truck-driving problem is far too complex to solve with this approach. Instead, the problem is being tackled over time with a lot of experimentation and testing, one module at a time. Today we have laser following cruise control and tomorrow we will have lane following capability. Soon we might expect congestion detectors and GPS guidance. Someday the truck-driving problem might be solved, but by the time it is, the system will no doubt be a lot different than what we imagine today.

Conventional Wisdom
Unfortunately, it has been conventional wisdom in software development to separate design from coding, coding from testing, and software from the system it supports. This gives us development processes that ignore the learning loops necessary to discover the logic of a complex system, create concrete representations of the system, make sure that these work together, and over time, grow a system that becomes capable of accomplishing the complete job. In software development, we have been asked to solve too many truck-driving problems. And when it turns out that we have been handed an impossible problem, it’s usually the developers – not the process or the scale of the problem – that are held responsible for the failure.

When I was an IT manager in a manufacturing plant in the early 1980’s, we discovered that the conventional wisdom about the way that manufacturing should be done had become obsolete. We figured this out because our competitors in Japan started doing things that produced far better results than we were able to achieve. In response to this serious competitive threat, we threw out conventional wisdom and decided to try the counterintuitive approach being used in Japan, called “Just-in-Time.” As a management team, we came to agree on a few basic principles and enlisted the wisdom of everyone in the plant to figure out how to make these principles work in practice. Indeed, it took some time and a lot of hard work to implement Just-in-Time in our plant. As part of the effort, we completely changed the way we thought about quality and used statistics to gain a deeper insight into how our equipment worked. Slowly, it seemed to us, we got better. In retrospect, the improvement was dramatic, but it certainly didn’t feel like it at the time.

Today, the name “Just-in-Time” has been replaced with “Lean,” but to me it remains largely about the same thing: abandoning conventional wisdom that has become obsolete and moving on to a new way of thinking. The transformation will be multifaceted, principle-based, and entail a lot of very hard work by everyone, workers and managers alike. And – probably – it will only happen if there is something that shakes people up enough to cause them to abandon conventional wisdom and look for a new way of thinking about how to do their job.

Analogies
For those who look upon Lean as a set of operational practices, it doesn’t make sense to apply Lean to software development. Inventory, motion, variation, overproduction – the wastes of an operational process – don’t translate easily to the job of creating the brains of a system and making it smarter it over time. In fact, software development has long been plagued by inappropriate comparisons with other fields. Too often, analogies are created by someone who has only a passing acquaintance with a field. For example, someone who knows little about construction might say: “Buildings are completely designed before construction starts – if it works for buildings, why can’t it work for software?” I once discussed this analogy with a group of construction superintendants, who just about laughed me out of the room. They live in a world of incomplete and conflicting drawings, master schedules that bear no resemblance to reality, owners who regularly change their minds, and the constant threat of lawsuits.

Manufacturing analogies have been foisted upon software development by those who think that “cutting code” is pretty much the same thing as cutting metal. It’s painful to imagine the damage that has been done to software development by the manufacturing slogan “Do it Right the First Time.” I often wonder how this slogan came to mean that code should never have to be changed once it is committed to the code base. In our plant, product specs and manufacturing processes changed all the time; we just tested a product after each tiny step to be sure that no defects had appeared. Declaring that we should not have to change code once it is written is like decreeing that once we start our truck out across the country we should never have to change the planned route, no matter what detours or bad weather or flat tires we might encounter along the way.

I was only vaguely aware of the dangers of analogies when I set out to compare Lean software development to Lean manufacturing. I like using analogies – consider the truck-driving problem for example. I think of analogies as tools to help us understand and agree upon principles; but they should never be used as implementation guidelines. Copying specific practices from another field – or even from another company in our field – is a lazy way to implement change. First class execution is possible only when teams carefully think through the principles behind new ideas, understand how these principles apply to their world, and carefully adapt specific practices so that they make sense in the new context.

Paradigm Shift
I didn’t run into the term “waterfall” until 1999, and when I learned what it meant, I did not understand how it could possibly work. Therefore I was not surprised to discover that “waterfall” processes really don’t work – what surprised me was the fact that conventional wisdom held that they should work. I decided that the time had come for a paradigm shift in software development, similar to the paradigm shift that manufacturing experienced during the 1980’s and early 90’s.

Paradigm shifts require that someone with a clear understanding of a core problem in a particular field demonstrate a new and significantly better way to address this core problem. There’s no question in my mind that in manufacturing, the core problem was push scheduling – at least it certainly was in our plant. Simply implementing an effective pull system drove all sorts of other good behavior, and led eventually to significant cost reductions. We decommissioned a lot of software when we implemented our pull system, because the logic of our existing scheduling system was fundamentally flawed.

In that 1999 waterfall project, the core problem I experienced was the idea that development should be a series of handoffs: Analysis, Design, Coding, Testing, Deployment. The problem wasn’t that these steps were unimportant, but that each step was supposed to be completed before the next step began – and since the next step would be done by a different group of people, the handoff had to be done through documentation. The counterintuitive concept in Lean software development is to turn this process on its side and deploy completely done software in small increments. Let’s not even try to develop a system that will drive a truck, let’s see if it is possible to add some intelligence to cruise control and get that working while there is still a driver behind the wheel. Of course this means we are not sure how a fully automated truck will work, when it might be ready or how much it might cost. But if we keep the ultimate goal of an automated truck in mind and design our laser following cruise control wisely, we will be a step closer to a self-driving truck.

It might seem obvious that a completely automated truck is far too ambitious an undertaking, so splitting it up into incremental steps is the best way to make progress. What is counterintuitive is that this approach should scale downward. But it does. And if you look at any really successful complex system, this is the way it was developed. Lean development requires a visionary leader and a sponsor willing to fund the vision rather than a promise that is unlikely to be kept. However, such a sponsor can be hard to find; sponsors always seem to want a “plan.”
 
The “Plan”
The core problem in software development can be boiled down to the intense pressure for a “plan” that lays out what the software will be able to do, how long it will take, and what it will cost – and the subsequent expectation that development will follow this “plan”. The problem is magnified when the software is expected to be developed independently from the system for which the software will supply the brains. Why is planning a problem? Isn’t a plan essential? As Dwight Eisenhower once said: planning is indispensable, but plans are useless.

The problem with software is that the logic behind any system is inherently complex, and developing that logic independently from the system increases the complexity by at least an order of magnitude. As Fred Brooks once noted, “The complexity of software is an essential property… Many of the classical problems of developing software products derive from this essential complexity and its nonlinear increase with size.”[3] Trying to plan a large software development effort is not much different than trying to plan the development of a software package to drive a truck across America – without access to the truck.

You might notice that the core problem of software development is beginning to bear some resemblance to the core problem of manufacturing – we suffer from push scheduling in manufacturing and push planning in software development. But the antidote is somewhat different. In manufacturing, switching from push to pull scheduling gives dramatic results. In software development, switching from forecast-driven to feedback-driven development gives equally dramatic results.

The Antidote
Embedded in every development “plan” is a forecast – a guess really – of what will happen in the future. Plans that separate the logic of a system from the system itself are based on an additional layer of guessing – ahem – forecasting. If we base the development of a complex system on forecasts, we are doing forecast-driven development. If we develop and deploy small useful feature sets and get them working incrementally, then we are doing feedback-driven development. For simple systems, either approach will work. For large, complex or evolving systems, the only feasible approach is feedback-driven development.

There is a great appetite for predictability in any business that has to answer to shareholders or any organization that is under public scrutiny. This is entirely appropriate. However, the idea that predictability comes from creating a plan and then following the plan is fundamentally flawed when complex systems are involved. Following a plan will create predictability only to the extent that the plan is based on an accurate forecast of the future and a thorough understanding of the complexity of the system to be developed. Since I am a process control engineer, I would like to call to your attention something we learned a long time ago: When you really need predictability, you create a feedback system that can respond to change as it occurs, rather than a predictive system that is incapable of dealing with variation.

Many people are concerned about feedback-driven development – it seems to imply a lack of control. But when we are trying to create the brains behind a system, control is hardly what it is all about. The vision behind the Internet had nothing to do with control – and everything to do with finding ways for people to communicate and think more effectively. It took decades of detailed work engaging great minds from around the world for the Internet to become a reality, and it will continue to emerge for decades to come. This great network of software started with a vision and grew with careful guidance, detailed technical work, and extensive collaboration. If you want to understand how Lean software development works, you need look no further.


References and Notes
[1]Licklider, L.C.R. (1960). "Man-Computer Symbiosis" IRE Transactions on Human Factors in Electronics, v.HFE-1. p.4-11.

[2] This was described in a series of memos by Licklider.

[3] The Mythical Man Month, 20th Anniversary Edition, by Fred P. Brooks, Jr., Addison Wesley,1995.

August 1, 2003

Concurrent Development

When sheet metal is formed into a car body, a massive machine called a stamping machine presses the metal into shape. The stamping machine has a huge metal tool called a die which makes contact with the sheet metal and presses it into the shape of a fender or a door or a hood. Designing and cutting these dies to the proper shape accounts for half of the capital investment of a new car development program, and drives the critical path. If a mistake ruins a die, the entire development program suffers a huge set-back. So if there is one thing that automakers want to do right, it is the die design and cutting.

The problem is, as the car development progresses, engineers keep making changes to the car, and these find their way to the die design. No matter how hard the engineers try to freeze the design, they are not able to do so. In Detroit in the 1980’s the cost of changes to the design was 30 – 50% of the total die cost, while in Japan it was 10 – 20% of the total die cost. These numbers seem to indicate the Japanese companies must have been much better at preventing change after the die specs were released to the tool and die shop. But such was not the case.

The US strategy for making a die was to wait until the design specs were frozen, and then send the final design to the tool and die maker, which triggered the process of ordering the block of steel and cutting it. Any changes went through a arduous change approval process. It took about two years from ordering the steel to the time that die would be used in production. In Japan, however, the tool and die makers order up the steel blocks and start rough cutting at the same time the car design is starting. This is called concurrent development. How can it possibly work?

The die engineers in Japan are expected to know a lot about what a die for a front door panel will involve, and they are in constant communication with the body engineer. They anticipate the final solution and they are also skilled in techniques to make minor changes late in development, such as leaving more material where changes are likely. Most of the time die engineers are able to accommodate the engineering design as it evolves. In the rare case of a mistake, a new die can be cut much faster because the whole process is streamlined.

Japanese automakers do not freeze design points until late in the development process, allowing most changes occur while the window for change is still open. When compared to the early design freeze practices in the US in the 1980’s, Japanese die makers spent perhaps a third as much money on changes, and produced better die designs. Japanese dies tended to require fewer stamping cycles per part, creating significant production savings.

The significant difference in time-to-market and increasing market success of Japanese automakers prompted US automotive companies to adopt concurrent development practices in the 1990’s, and today the product development performance gap has narrowed significantly.

Concurrent Software Development
Programming is a lot like die cutting. The stakes are often high and mistakes can be costly, so sequential development, that is, establishing requirements before development begins, is commonly thought of as a way to protect against serious errors. The problem with sequential development is that it forces designers to take a depth-first rather than a breadth-first approach to design. Depth-first forces making low level dependant decisions before experiencing the consequences of the high level decisions. The most costly mistakes are made by forgetting to consider something important at the beginning. The easiest way to make such a big mistake is to drill down to detail too fast. Once you set down the detailed path, you can’t back up, and aren’t likely to realize that you should. When big mistakes can be made, it is best to survey the landscape and delay the detailed decisions.

Concurrent development of software usually takes the form of iterative development. It is the preferred approach when the stakes are high and the understanding of the problem is evolving. Concurrent development allows you to take a breadth-first approach and discover those big, costly problems before it’s too late. Moving from sequential development to concurrent development means starting programming the highest value features as soon as a high level conceptual design is determined, even while detailed requirements are being investigated. This may sound counterintuitive, but think of it as an exploratory approach which permits you to learn by trying a variety of options before you lock in on a direction that constrains implementation of less important features.

In addition to providing insurance against costly mistakes, concurrent development is the best way to deal with changing requirements, because not only are the big decisions deferred while you consider all the options, but the little decisions are deferred as well. When change is inevitable, concurrent development reduces delivery time and overall cost, while improving the performance of the final product.

If this sounds like magic – or hacking – it would be if nothing else changed. Just starting programming earlier, without the associated expertise and collaboration found in Japanese die cutting, is unlikely to lead to improved results. There are some critical skills that must be in place in order for concurrent development to work.

Under sequential development, US automakers considered die engineers to be quite remote from the automotive engineers, and so too, programmers in a sequential development process often have little contact with the customers and users who have requirements and the analysts who collect requirements. Concurrent development in die cutting required US automakers to make two critical changes – the die engineer needed the expertise to anticipate what the emerging design would need in the cut steel, and had to collaborate closely with the body engineer.

Similarly, concurrent software development requires developers with enough expertise in the domain to anticipate where the emerging design is likely to lead, and close collaboration with the customers and analysts who are designing how the system will solve the business problem at hand.

The Last Responsible Moment
Concurrent software development means starting developing when only partial requirements are known and developing in short iterations which provide the feedback that causes the system to emerge. Concurrent development makes it possible to delay commitment until the Last Responsible Moment, that is, the moment at which failing to make a decision eliminates an important alternative. If commitments are delayed beyond the Last Responsible Moment, then decisions are made by default, which is generally not a good approach to making decisions.

Procrastinating is not the same as making decisions at the Last Responsible Moment; in fact, delaying decisions is hard work. Here are some tactics for making decisions at the Last Responsible Moment:

  • Share partially complete design information. The notion that a design must be complete before it is released is the biggest enemy of concurrent development. Requiring complete information before releasing a design increases the length of the feedback loop in the design process and causes irreversible decisions to be made far sooner than necessary. Good design is a discovery process, done through short, repeated exploratory cycles.
  • Organize for direct, worker-to-worker collaboration.  Early release of incomplete information means that the design will be refined as development proceeds. This requires that upstream people who understand the details of what the system must do to provide value must communicate directly with downstream people who understand the details of how the code works.
  • Develop a sense of how to absorb changes.  In ‘Delaying Commitment,’ IEEE Software (1988), Harold Thimbleby observes that the difference between amateurs and experts is that experts know how to delay commitments and how to conceal their errors for as long as possible. Experts repair their errors before they cause problems. Amateurs try to get everything right the first time and so overload their problem solving capacity that they end up committing early to wrong decisions. Thimbleby recommends some tactics for delaying commitment in software development, which could be summarized as an endorsement of object-oriented design and component-based development:
  • Use Modules.  Information hiding, or more generally behavior hiding, is the foundation of object-oriented approaches. Delay commitment to the internal design of the module until the requirements of the clients on the interfaces stabilize. 
  • Use Interfaces. Separate interfaces from implementations. Clients should not de-pend on implementation decisions.
  • Use Parameters.Make magic numbers – constants that have meaning – into parameters. Make magic capabilities like databases and third party middleware into parameters. By passing capabilities into modules wrapped in simple interfaces, your dependence on specific implementations is eliminated and testing becomes much easier.
  • Use Abstractions.  Abstraction and commitment are inverse processes. Defer commitment to specific representations as long as the abstract will serve immediate design needs.
  • Avoid Sequential Programming.  Use declarative programming rather than procedural programming, trading off performance for flexibility. Define algorithms in a way that does not depend on a particular order of execution.
  • Beware of custom tool building.  Investment in frameworks and other tooling frequently requires committing too early to implementation details that end up adding needless complexity and seldom pay back. Frameworks should be extracted from a collection of successful implementations, not built on speculation.
Additional tactics for delaying commitment include:
  • Avoid Repetition. This is variously known as the Don’t Repeat Yourself (DRY) or Once And Only Once (OAOO) principle. If every capability is expressed in only one place in the code, there will be only one place to change when that capability needs to evolve and there will be no inconsistencies.
  • Separate Concerns.  Each module should have a single well defined responsibility. This means that a class will have only one reason to change. 
  • Encapsulate Variation. What is likely to change should be inside, the interfaces should be stable. Changes should not cascade to other modules. This strategy, of course, depends on a deep understanding of the domain to know which aspects will be stable and which variable. By application of appropriate patterns, it should be possible to extend the encapsulated behavior without modifying the code itself. 
  • Defer Implementation of Future Capabilities. Implement only the simplest code that will satisfy immediate needs rather than putting in capabilities you ‘know’ you will need in the future. You will know better in the future what you really need then and simple code will be easier to extend then if necessary.
  • Avoid extra features. If you defer adding features you ‘know’ you will need, then you certainly want to avoid adding extra features ‘just-in-case’ they are needed. Extra features add an extra burden of code to be tested and maintained, and understood by programmers and users alike. Extra features add complexity, not flexibility.
Much has been written on these delaying tactics, so they will not be covered in detail in this book.
  • Develop a sense of what is critically important in the domain.  Forgetting some critical feature of the system until too late is the fear which drives sequential development. If security, or response time, or fail safe operation are critically important in the domain, these issues need to be considered from the start; if they are ignored until too late, it will indeed be costly. However, the assumption that sequential development is the best way to discover these critical features is flawed. In practice, early commitments are more likely to overlook such critical elements than late commitments, because early commitments rapidly narrow the field of view.
  • Develop a sense of when decisions must be made.  You do not want to make decisions by default, or you have not delayed them. Certain architectural concepts such as usability design, layering and component packaging are best made early, so as to facilitate emergence in the rest of the design. A bias toward late commitment must not degenerate into a bias toward no commitment. You need to develop a keen sense of timing and a mechanism to cause decisions to be made when their time has come.
  • Develop a quick response capability. The slower you respond, the earlier you have to make decisions. Dell, for instance, can assemble computers in less than a week, so they can decide what to make less than a week before shipping. Most other computer manufacturers take a lot longer to assemble computers, so they have to decide what to make much sooner. If you can change your software quickly, you can wait to make a change until customers’ know what they want.
Cost Escalation
Software is different from most products in that software systems are expected to be upgraded on a regular basis. On the average, more than half of the development work that occurs on a software system occurs after it is first sold or placed into production. In addition to internal changes, software systems are subject to a changing environment – a new operating system, a change in the underlying database, a change in the client used by the GUI, a new application using the same database, etc. Most software is expected to change regularly over its lifetime, and in fact once upgrades are stopped, software is often nearing the end of its useful life. This presents us with a new category of waste, that is, waste caused by software that is difficult to change.

In 1987 Barry Boehm wrote, “Finding and fixing a software problem after delivery costs 100 times more than finding and fixing the problem in early design phases”. This observation became been the rational behind thorough up front requirements analysis and design, even though Boehm himself encouraged incremental development over “single-shot, full product development.” In 2001, Boehm noted that for small systems the escalation factor can be more like 5:1 than 100:1; and even on large systems, good architectural practices can significantly reduce the cost of change by confining features that are likely to change to small, well-encapsulated areas.

There used to be a similar, but more dramatic, cost escalation factor for product development. It was once estimated that a change after production began could cost 1000 times more than if the change had been made in the original design. The belief that the cost of change escalates as development proceeds contributed greatly to the standardizing the sequential development process in the US. No one seemed to recognize that the sequential process could actually be the cause of the high escalation ratio. However, as concurrent development replaced sequential development in the US in the 1990’s, the cost escalation discussion was forever altered. The discussion was no longer how much a change might cost later in development; the discussion centered on how to reduce the need for change through concurrent engineering.

Not all change is equal. There are a few basic architectural decisions that you need to get right at the beginning of development, because they fix the constraints of the system for its life. Examples of these may be choice of language, architectural layering decisions, or the choice to interact with an existing database also used by other applications. These kinds of decisions might have the 100:1 cost escalation ratio. Because these decisions are so crucial, you should focus on minimizing the number of these high stakes constraints. You also want to take a breadth-first approach to these high stakes decisions.

The bulk of the change in a system does not have to have a high cost escalation factor; it is the sequential approach that causes the cost of most changes to escalate exponentially as you move through development. Sequential development emphasizes getting all the decisions made as early as possible, so the cost of all changes is the same – very high. Concurrent design defers decisions as late as possible. This has four effects:
  • Reduces the number of high-stake constraints.
  • Gives a breadth-first approach to high-stakes decisions, making it more likely that they will be made correctly.
  • Defers the bulk of the decisions, significantly reducing the need for change.
  • Dramatically decreases the cost escalation factor for most changes.
A single cost escalation factor or curve is misleading. Instead of a chart showing a single trend for all changes, a more appropriate graph has at least two cost escalation curves, as show in Figure 3-1. The agile development objective is to move as many changes as possible from the top curve to the bottom curve.

Figure 3-1. Two Cost Escalation Curves
Returning for a moment to the Toyota die cutting example, the die engineer sees the conceptual design of the car and knows roughly the size of door panel is necessary. With that information, a big enough steel block can be ordered. If the concept of the car changes from a small, sporty car to a mid-size family car, the block of steel may be too small, and that would be a costly mistake. But the die engineer knows that once the overall concept is approved, it won’t change, so the steel can be safely ordered, long before the details of the door emerge. Concurrent design is a robust design process because the die adapts to whatever design emerges.

Lean software development delays freezing all design decisions as long as possible, because it is easier to change a decision that hasn’t been made. Lean software development emphasizes developing a robust, change-tolerant design, one that accepts the inevitability of change and structures the system so that it can be readily adapted to the most likely kinds of changes.

The main reason why software changes throughout its lifecycle is that the business process in which it is used evolves over time. Some domains evolve faster than others, and some domains may be essentially stable. It is not possible to build in flexibility to accommodate arbitrary changes cheaply. The idea is to build tolerance for change into the system along domain dimensions that are likely to change. Observing where the changes occur during iterative development gives a good indication of where the system is likely to need flexibility in the future. If changes of certain types are frequent during development, you can expect that these types of changes will not end when the product is released. The secret is to know enough about the domain to maintain flexibility, yet avoid making things any more complex than they must be.

If a system is developed by allowing the design to emerge through iterations, the design will be robust, adapting more readily to types of changes that occur during development. More importantly, the ability to adapt will be built-in to the system, so that as more changes occur after its release, they can be readily incorporated. On the other hand, if systems are built with a focus on getting everything right at the beginning in order to reduce the cost of later changes, their design is likely to be brittle and not accept changes readily. Worse, the chance of making a major mistake in the key structural decisions is increased with a depth-first, rather than a breadth-first approach.

April 25, 2003

Lean Software Development

I often hear developers say: Life would be so much easier if customers would just stop changing their minds. In fact, there is a very easy way to keep customers from changing their minds – give them what they ask for so fast that they don’t have the time to change their minds.

When you order something on-line, it’s usually shipped before you have time for second thoughts. Because it ships so fast, you can wait until you’re sure of what you want before you order. But once you place the order, you have very little time to change your mind.

The idea behind lean thinking is exactly this: Let customers delay their decisions about exactly what they want as long as possible, and when they ask for something, give it to them so fast they don’t have time to change their minds.

Sure, you say, this is fine for Amazon.com, but how does it relate to software development? The way to deliver things rapidly is to deliver them in small packages. The bigger the increment of functionality you try to deliver, the longer it takes to decide what is needed and then get it developed, tested, and deployed. Maintenance programmers have known this for years. When a piece of production code breaks, they find the cause, create a patch, test it rigorously, and release it to production – usually in the space of a few hours or days.

But, you say, development is different; we need to develop a large system, we need a design, and we can’t deploy the system piecemeal. Even large systems that have to be deployed all-at-once should be developed in small increments. True, design is needed, but there is scant proof that great designs are achieved by meticulously gathering detailed requirements and analyzing them to death. Great designs come from great designers, and great designers understand that designs emerge as they develop a growing understanding of the problem.

As Harold Thimbleby said in Delaying Commitment [1], “In many disciplines, the difference between amateurs and experts seems to be that experts know how to delay their commitments…. Amateurs, on the other hand, try to get things completely right the first time and often fail… in their anxious desire to avoid error, they make early commitments – often the wrong ones… In fact, the expert’s strategy of postponing firm decisions, discovering constraints, and then filling in the details is a standard heuristic to solve problems.”

Lean Thinking
Over the last two decades, Lean Thinking has created fundamental transformations in the way we organize manufacturing, logistics, and product development. For example, concurrent development has replaced sequential development in industries from airlines to automobiles, cutting product development time by perhaps a third and development cost in half, while improving the quality and timeliness of the product. There are those who think that rapid development is equivalent to shoddy work, but lean organizations have demonstrated quite the opposite. The measure of the maturity of an organization is the speed with which it can reliably and repeatedly respond to a customer request.

Yes, you heard that right. Maturity is not measured by the comprehensiveness of process documentation or the ability to make detailed plans and follow them. It is measured by operational excellence, and the key indicator of operational excellence is the speed with which the organization can reliably and repeatedly serve its customers. Thirty years ago, Frederick W. Smith, the founder of FedEx, envisioned an overnight delivery system the seemed ridiculous to most people; today even the post office offers overnight delivery. A decade ago, Toyota could develop a new car twice as fast as GM; today all automotive companies measure and brag about the speed with which they can bring a new car to market.

Let’s revisit those customers you wish would make up their minds and stick to their decisions. Ask yourself this question: Once they do make up their minds, how fast can you reliably and repeatedly deliver what they want? Perhaps the problem does not lie in customers who can’t make up their minds and keep changing their decisions. Perhaps the problem lies in asking them to decide well before they have the necessary information to make a decision, and in taking so long to deliver that their circumstances change.

Principles of Lean Software Development
There are seven principles of Lean Software Development, drawn from the seven principles of Lean Thinking. These principles are not cook-book recipes for software development, but guideposts for devising appropriate practices for your environment.[2] These lean principles have led to dramatic improvements in areas as diverse as military logistics, health care delivery, building construction, and product development. When wisely translated to your environment, they can change your basis of competition.

Eliminate Waste
All lean thinking starts with a re-examination of what waste is and an aggressive campaign to eliminate it. Quite simply, anything you do that does not add value from the customer perspective is waste. The seven wastes of software development are: 
  • Partially Done Work (the “inventory” of a development process)
  • Extra Processes (easy to find in documentation-centric development)
  • Extra Features (develop only what customers want right now)
  • Task Switching (everyone should do one thing at a time)
  • Waiting (for instructions, for information)
  • Handoffs (tons of tacit knowledge gets lost)
  • Defects (at least defects that are not quickly caught by a test)
All lean approaches focus on eliminating waste by looking at the flow of value from request to delivery. So if a customer wants something, what steps does that customer request have to go thorough to get delivered to the customer? How fast does that process flow? If a customer request waits in a queue for approval, a queue for design, a queue for development, a queue for testing, and a queue for deployment, work does not flow very fast. The idea is to create cells (or teams) of people chartered to take each request from cradle to grave, rapidly and without interruption. Then value flows.

Amplify Learning
The game of development is a learning game: hypothesize what might work, experiment to see if it works, learn from the results, do it again. People who design experiments know that greatest learning occurs when half of the experiments fail, because this exposes the boundary conditions. A development environment is not a place for slogans such as:
  • Plan The Work And Work The Plan
  • Do It Right The First Time
  • Eliminate Variability
The learning that comes from short feedback loops is critical to any process with inherent variation. The idea is not to eliminate variation, it is to adapt to variation through feedback. Your car’s cruise control adapts to hilly terrain by frequently measuring the difference desired speed and actual speed and adjusting the accelerator. Similarly, software development uses frequent iterations to measures the difference between what the software can do and what the customer wants, and makes adjustments accordingly.

A lean development environment focuses on increasing feedback, and thus learning. The primary way to do this in software development is with short, full-cycle iterations. Short means a week to a month. Full cycle means the iteration results in working software: tested, integrated, deployable code. There should be a bias to deploy each iteration into production, but when that is not possible, end users should simulate use of the software in a production-equivalent environment.

We have known for a long time that iterative (evolutionary) development is the best approach for software development. In 1987 the report of the Defense Science Board Task Force on Military Software noted: “Document-driven, specify-then-build approach lies at the heart of so many DoD software problems…. Evolutionary development is best technically, and it saves time and money.”[3]


Delay Commitment
Delaying commitment means keeping your options open as long as possible. The fundamental lean concept is to delay irreversible decisions until they can be made based on known events, rather than forecasts. Economic markets develop options as a way to deal with uncertainty. Farmers, for example, can buy an option on the future price of grain. If the price drops, they have protected their profits. If the price raises, they can ignore the option and sell at the higher price. Options let people delay decisions until they have more information.

There are a lot of ways to keep options open in software development. Here are a few:
  • Share partially complete design information.
  • Organize for direct, worker-to-worker collaboration.
  • Develop a sense of when decisions must be made.
  • Develop a sense of how to absorb changes.
  • Avoid Repetition
  • Separate Concerns
  • Encapsulate Variation
  • Defer Implementation of Future Capabilities
  • Commit to Refactoring
  • Use Automated Test Suites
Deliver Fast
To those who equate rapid software development with hacking, there seems to be no reason to deliver results fast, and every reason to be slow and careful. Similarly, when Just-in-Time concepts surfaced in Japan in the early 1980’s, most western manufacturers could not fathom why they made sense. Everybody knew that the way to make customers happy was to have plenty of product on the shelf, and the way to maximize profits was to build massive machines and keep them busy around the clock. It took a long time for people to realize that this conventional wisdom was wrong.

The goal is to let your customer take an options-based approach to making decisions, letting them delay their decisions a long as possible so they can make decisions based on the best possible information. Once your customers decide what they want, your goal should be to create that value just as fast as possible. This means no delay in deciding what requests to approve, no delay in staffing, immediate clarification of requirements, no time-consuming handoffs, no delay in testing, no delay for integration, no delay in deployment. In a mature software development organization, all of this happens in one smooth, rapid flow in response to a customer need.

Empower the Team
In a lean organization, things moves fast, so decisions about what to do have to be made by the people doing the work. Flow in a lean organization is based on local signaling and commitment amongst team members, not on management directives. The work team designs its own processes, makes its own commitments, gathers the information needed to reach its goals, and polices itself to meet its milestones.

Wait a minute, you say. Why would I want to be empowered? If I make the decisions, then I’ll get blamed when things go wrong. A team is not empowered unless it has the training, expertise, and leadership necessary to do the job at hand. But once those elements are in place, a working team is far better equipped to make decisions than those who are not involved in the day-to-day activities of developing software. It is true that decision-making carries greater responsibility, but it also brings significantly greater influence on the course of events and the success of the development effort.

Consider an emergency response unit such as firefighters. Members receive extensive training, both in the classroom and on the job. Exercises and experience imprint patterns of how to respond to difficult situations. When an emergency occurs, the team responds to the situation as it unfolds; there is little time to ask remote commanders what to do, nor would it make sense. The important thing is that the responding teams have the training, organization and support to assess the situation as they encounter it and make basically correct decisions on their own.

Similarly in software, the development team is in the best position to know how to respond to difficult problems and urgent requests. The best way to be sure that you get things right is to work directly with customers to understand their needs, collaborate with colleagues to figure out how to meet those needs, and frequently present the results to customers to be sure you are on the right track. Management’s job to supply the organization, training, expertise, leadership, and information so that you generally make the right decisions, make rapid course corrections as you learn, and end up with a successful outcome.

Build Integrity In
There are two kinds of integrity – perceived integrity and conceptual integrity. Software with perceived integrity delights the customer – it’s exactly what they want even though they didn’t know how to ask for it. Google comes to mind – when I use Google I imagine that the designers must have gotten inside my head when they added the spelling checker. I would never have known to ask for this feature, but these days I type most URLs into the Google toolbar because if I mistype, Google will set me straight.

The way to achieve perceived integrity is to have continuous, detailed information flow from the users, or user proxies, to the developers. This is often done by an architect or master designer who understands the user domain in detail and makes sure that the developers always have the real user needs in front of them as they make day-to-day design decisions. Note that the technical leader facilitates information flow and domain understanding, she or he is intimately involved in the day-to-day work of the developers, keeping the customer needs always in mind. However, it is the developers, not the leader, who make the detailed, day-to-day decisions and tradeoffs that shape the system.

Conceptual integrity means that all of the parts of a software system work together to achieve a smooth, well functioning whole. Software with conceptual integrity presents the user with a single metaphor of how a task is to be done. You don’t have one way of buying airline tickets if you are paying with cash and a totally different way if you are using frequent flier miles. You don’t use kilometers in one module and miles in another.

Conceptual integrity is achieved through continuous, detailed information flow between various technical people working on a system. There are no two ways about it, people have to talk to each other, early and often. There can be no throwing things over the wall, no lines between supplier, development team, support team, customer. Everyone should be involved in detailed discussions of the design as it develops, from the earliest days of the program.

For example, Boeing credits its rapid and successful development of the 777 to its ‘Working Together’ program, where customers, designers, suppliers, manufacturers, and support teams all met from the start to design the plane. Early on it was discovered that the fuel tank was beyond the reach of all existing refueling trucks, a mistake that was easily fixed. In a normal development process this expensive mistake would not have been discovered until someone tried to fuel the first plane.

There are those who believe that software integrity comes from a documentation-centric approach to development: define the requirements in detail and trace every bit of code back to those requirements. In fact, such an approach tends to interfere with the technical communication that is essential to integrity. Instead of a documentation-centric approach, use a test-centric approach to integrity. Test early, test often, test exhaustively, and make sure an automated test suite is delivered as part of the product.

See the Whole
When you look at them closely, most theories of how to manage software projects are based on a theory of disaggregation: break the whole into individual parts and optimize each one. Lean thinking suggests that optimizing individual parts almost always leads to sub-optimized overall system.

Optimizing the use of testing resources, for example, decreases the ability of the overall system to rapidly produce tested, working code. Measuring an individual’s ability to produce code without defects ignores the well-known fact that about 80% of defects are caused by the way the system works, and hence are management problems.

The best way to avoid sub-optimization and encourage collaboration is to make people accountable for what they can influence, not just what they can control. This means measuring performance one level higher than you would expect. Measure the team’s defect count, not that of individuals. Make testing as accountable for defect-free code as developers. To some it seems unfair to hold a team accountable for individual performance, but lean organizations have found that individuals are rarely able to change the system which influences their performance. However a team, working together and responsible for its own processes, can and will make dramatic improvements.

Conclusion
To keep customers from changing their minds, raise the maturity of your organization to the level where it can reliably deliver what customers want so fast that they have no time to change their minds. Focus on value, flow, and people, the rest will take care of itself
_________________
References
[1]Harold Thimbleby, "Delaying Commitment" IEEE Software, May 1988.

[2]The book Lean Software Development: An Agile Toolkit by Mary Poppendieck and Tom Poppendieck, Addison-Wesley Professional, 2003, provides twenty two tools for converting lean principles into agile software development practices.

[3]Craig Larman, “A History of Iterative and Incremental Development”, IEEE Computer, June 2003

Screen Beans Art, © A Bit Better Corporation

January 6, 2003

Lessons from Planned Economies

Just as a market economy which relies on the collective actions of intelligent agents gives superior performance in a complex and changing economic environment, so too an agile project leadership approach which leverages the collective intelligence of a development team will give superior performance in a complex and changing business environment. However, conventional project management training focuses on using a plan as the program for action; it does not teach project leaders how to create a software development environment that fosters self-organization and learning. Since very few courses with such a focus are available today, this paper proposes a curriculum for agile software development leaders.

Planned Economies
In the middle of the 20th century, dozens of countries and millions of people believed that central planning was the best way to run their economies. Even today there are many people who can’t quite understand why market economies invariably outperform planned economies; it would seem that at least some of the planned economies should have flourished. After all, there are advantages to centralizing economic decisions: virtually full employment is possible; income can be distributed more equally; central coordination should be more efficient; directing resources into investment should spur growth. So why did planned economies fail?

There are two fundamental problems with planned economies: First, in a complex and changing economic system, it is impossible to plan for everything, so a lot of things fall between the cracks. For instance, planned economies usually suffer a shortage of spare parts, because no one plans for machines to break down. Secondary effects such as environmental impact are often ignored. Furthermore, planners do not have control of the purchase of goods, so they have to guess what consumers really want. Inaccurate forecasts are amplified by a long planning cycle, causing chronic shortages and surpluses.

The second problem with planned economies is diminished incentives for individuals. When compensation does not depend on contribution, there is little to gain from working hard. When incentives are tied to meeting targets, risk adverse managers focus on routine production to meet goals. The stronger that rewards are tied to meeting targets, the more disincentive there is for being creative or catching the things that fall between the cracks.

If we look at conventional software project management, we see practices similar to those used in planned economies, and we also see the similar results. Among projects over $3 million, less than 10% meet the conventional definition of success: on time, on budget, on scope. For projects over $6 million the number drops below 1% [1]. Interestingly, the underlying causes of failure of planned economies are the same things that cause failure in software projects, and further, the remedy is similar in both cases.

The difference between a planned and a market economy is rooted in two different management philosophies: management-as-planning/adhering and management-as-organizing/learning. Management-as-planning/adhering focuses on creating a plan that becomes a blueprint for action, then managing implementation by measuring adherence to the plan. Management-as-organizing/learning focuses on organizing work so that intelligent agents know what to do by looking at the work itself, and improve upon their implementation through a learning process.

The Planning/Adhering Model Of Project Management
Conventional wisdom holds that managing software projects is equivalent to meeting pre-planned cost, schedule and scope targets. The unquestioned dominance of cost, schedule and scope – often to the exclusion of less tangible factors such as usability or realization of purpose – draws heavily on the contract administration roots of project management. Therefore project management training and certification programs tend to focus on the management-as-planning/adherence philosophy. This philosophy has become entrenched because it seems to address two fears: a fear of scope-creep, and a fear that the cost of changes escalates significantly as development progresses.

However, management-as-planning/adherence leads to the same problems with software projects that planned economies suffered: in a complex and changing environment, it is virtually impossible for the plan to cover everything, and measuring adherence to the plan diminishes incentives for creativity and catching the things that fall between the cracks.

In the classic article ‘Managing by Whose Objectives?,’[4] Harry Levinson suggests that the biggest problem with management-by-objectives is that important intangibles which are not measurable fail to get addressed, because they are not in the action plan of any managers. Often these are secondary ‘hygiene’ factors, similar to environmental considerations in a planned economy.

In the book ‘Measuring and Managing Performance in Organizations’[5], Robert Austin makes the same point: over time, people will optimize what is measured and rewarded. Anything which is not part of the measurement plan will fade from importance. Austin points out that managers are often uncomfortable with the idea of not being able to measure everything, so they compensate through one of three techniques:
  • Standardization. By creating standards for each step in a development process, it is hoped that all steps in the project can be planned and measured, and nothing will be missed.
  • Specification. Specification involves constructing a detailed model of the product and/or process and planning every step in detail.
  • Subdivision, functional decomposition. The Work Breakdown Structure (WBS) is the classic example of attempts to decompose a project into steps so that all steps can be planned. 
Conventional project management practices have emphasized all of these techniques to help a project manager be certain that everything is covered in the project plan. However, just as in a planned economy, these techniques are insufficient to catch everything in all but the simplest of projects. In fact, drilling down to detail early in the project has the opposite effect – it tends to create blind spots, not resolve them. By taking a depth-first rather than a breadth-first approach to planning, mistakes and omissions become more likely,[6] and these tend to be more costly because of early investment in details. Thus an early drill-down approach tends to amplify, not reduce, the cost of change.

A management-as-planning/adherence approach also tends to amplify, not reduce, scope-creep. In many software development projects, a majority of the features are seldom or never used.[1] Part of the reason for this is that asking clients at the beginning of a project what features they want, and then preventing them from changing their minds later, creates strong incentives to increase the number of features requested, just in case they are needed. While limiting scope usually provides the best opportunity for reducing software development costs, fixing scope early and controlling it rigidly tends to expand, not reduce scope.

Just as in planned economies, management-as-planning/adhering tends to have unintended consequences that produce precisely the undesirable results that the plans were supposed to prevent. The problem lies not in the planning, which is very useful, but in using the plan as a roadmap for action and measuring performance against the plan.

The Organizing/Learning Model Of Project Management
Market economies deal with the problems of planned economies by depending upon collaborating intelligent agents to make decisions within an economic framework. In market economies, it is the job of the government to organize the economic framework with such things as anti-trust laws and social safety nets. Economic activity is conducted by intelligent agents who learn from experience what is needed and how to fill the needs.

Of course, the economies of individual countries dwarf most software projects, so we might look further to find examples of management-as-organizing/learning. We will explore two domains: manufacturing and product development.

Throughout most of the 20th century, mass production in the US focused on getting things done through central planning and control, reflecting the strong influence of Frederick Taylor’s Scientific Management. The climax came when computer systems made it possible to plan the exact movement of materials and work throughout a plant. Material Requirements Planning (MRP) systems were widely expected to increase manufacturing efficiency in the 1980’s, but in fact, most MRP systems were a failure at detailed production planning. They failed for the same reasons that planned economies failed: the systems could not readily adapt to slight variations in demand or productivity. Thus they created unworkable schedules, which had to be ignored, causing the systems to become ever more unrealistic.

As the centralized MRP planning systems were failing, Just-in-Time systems appeared as a counterpoint to Scientific Management. Just-in-Time forsakes central planning in favor of collaborating teams (intelligent agents). The environment is organized in such a way that the work itself and the neighboring teams signal what needs to be done; rather than a central plan. When problems occur, the root cause is sought out and eliminated, creating an environment in which intelligent agents continually improve the overall system. In almost all manufacturing environments, implementing Just-in-Time trumps any attempt to plan detailed production activities using a MRP system. These systems succeed for the same reason a market economy succeeds: intelligent agents are better at filling in the gaps and adapting to variation than a centrally planned system.

An argument can be made that manufacturing analogies are not appropriate for software development, because manufacturing is repetitive, while projects deal with unique situations. Because of this uniqueness, the argument goes, management as planning/ adhering is the only way to maintain control a design and development environment. A look at product development practices shows that the opposite is true: creating a detailed plan and measuring adherence to that plan is actually a rather ineffective approach a complex product development project.

In the late 1980’s Detroit was shocked to discover that a typical Japanese automotive company could develop a new car in 2/3’s the time for half the cost as a typical US automaker.[7] The difference was that product development in Japan used a concurrent development process, which allows for learning cycles during the design process as well as on-going communication and negotiation among intelligent agents as design proceeds.

Just as market economies routinely outperform planned economies, concurrent development routinely outperforms sequential development. Replacing sequential (plan-up-front) engineering with concurrent (plan-as-you-go) engineering has been credited with reducing product development time by 30-70%, engineering changes by 65-90%, and time to market by 20-90%, while improving quality by 200-600%, and productivity by 20-110%.[8]

Based on experience from other domains, management-as-organizing/learning would appear to have a better chance of resulting successful software projects than the prevailing management-as-planning/adhering approach. An examination of the Agile Manifesto shows that agile software development approaches favor the management-as-organizing/learning philosophy. (See Table 1.) Therefore, we can expect that in the long run, agile software development might significantly outperform traditional software development practices. In fact, evidence is mounting that agile approaches can be very effective. [9]

Table 1. Mapping Values from the Agile Manifesto to Management Philosophies

A Curriculum For Agile Software Project Leadership
Existing training for project management appears to be largely focused on the management-as-planning/adhering philosophy. Courses seem to be aimed at obtaining certification in an approach to project management developed for other domains, such as facilities construction or military procurement. Even courses aimed specifically at software development tend to focus on work breakdown and a front-end-loaded approach to managing scope. As we have seen, this is not a good match for concurrent development or agile software development.

It would seem that at a curriculum should be available for leaders of agile software development projects, given the dismal track record of current approaches and the potential of agile software development. Project managers who know how to develop work breakdown structures and measure earned value often wonder what to do with an agile software development project. Senior managers often wonder how to improve the skills of project leaders. Courses on management-as-organizing/learning are needed to fill this void, but there seem to be few project management courses with this focus. To help make agile project leadership training more widely available, this article outlines a possible curriculum for such courses.

Change the Name: Project Leadership
Since this is new territory, we may as well start with a new name, and move away from the administrative context of the word management. All projects, agile or otherwise, benefit from good leaders; that is, people who set direction, align people, and create a motivating environment. By using the term leadership we distinguish this course from one which focuses on the management tasks of planning, budgeting, staffing, tracking, and controlling.

Setting Direction
Planning is a good thing; the ultimate success of any project depends upon the people who implement a project understanding what constitutes success. Planning becomes brittle with it decomposes the problem too fast and moves too quickly to solutions. The best approach to early planning is to move up one notch and take a broader view, rather than decompose the problem and commit to detail too early.[6] A project leader starts by understanding the purpose of the project and keeping that purpose in front of the development team at all times.

Organizing Through Iterations
The idea of management-as-organizing/learning is to structure the work so that developers can figure out what to do from the work itself. The fundamental tool for doing this is short iterations which develop working software delivering business value. Project leaders need to know how to organize iteration planning meetings and how to structure the development environment and workday so that people know what to do when they come in to work every day, without being told.

This part of the curriculum must cover such concepts as story cards, backlog lists, daily meetings, pair programming, and information radiators. It should also stress the importance of organizing worker-to-worker collaboration between those who understand what the system must do to provide value and those who understand what the code does.

Concurrent Development
Strategies for concurrent development are an important tool for project leaders, especially in organizations which are used to sequential development. General strategies include:
  • sharing partially complete design information
  • communicating design constraints instead of proposed solutions
  • maintaining multiple options
  • avoiding extra features
  • developing a sense of how to absorb changes
  • developing a sense of what is critically important in the domain
  • developing a sense of when decisions must be made
  • delaying decisions until they must be made
  • developing a quick response capability
System Integrity
Project leaders must assure that the software developed under their guidance has integrity. This starts with assuring that the basic tools are in place for good software development: version control, a build process, automated testing, naming conventions, software standards, etc. Leaders must assure that the development team is guided by the true voice of the customer, so that the resulting system delivers value both initially and over time. They must assure that technical leadership establishes the basis of a sound architecture and an effective interface. They must make sure that comprehensive tests are used to provide immediate feedback, as well a framework so that refactoring can safely take place.

Leading Teams
People with experience in traditional project management who are about to lead agile software development projects might need some coaching in how to encourage a team make its own commitments, estimate its own work, and self-organize around iteration goals. Project leaders attend the daily meetings, listen to and solve team problems, serve as an intermediary between management and the team, secure necessary resources and technical expertise, resolve conflicts and keep everyone working together effectively; but they do not tell developers how to do their job. Project leaders coordinate the end-of iteration demonstration and the beginning of iteration planning, making sure that work is properly prioritized and all stakeholder interests are served.

Measurements
Feature lists or release plans, along with associated effort estimates, are often developed early in an agile project. The difference from traditional project management occurs when actual measurements begin to vary from these plans; for agile development, it is assumed that the plan is in error, and needs to be revised. By measuring the actual velocity or burndown rate, a far better picture of project health can be obtained than measuring variance from a guesstimate. Creating more accurate estimates becomes easier as developers gain experience in a domain and customers see working software. Leaders should learn how to combine reports of actual progress with increasingly accurate estimates into a tool for negotiating the scope of a project; this can be far more effective at limiting scope that the traditional method of fixing scope and controlling it with change approval mechanisms.

A useful technique for project leaders is to aggregate all measurements one level higher than normal.[5] This encourages collaboration and knowledge sharing because issues are called to the attention of a larger group of people. It also helps to avoid local optimization and the dangers of individual performance measurements. This technique is useful, for instance, for defect measurements.

Large Projects
Various techniques for synchronizing agile development across multiple teams are important for project managers to understand. Some of the techniques that might be covered are: divisible architectures, daily build and smoke test, spanning applications, loosely coupled teams that develop interfaces before modules.

Conclusion
We have often heard that the sequential, or waterfall, approach to software development projects is widely known to be ineffective, but it seems to be quite difficult to do things differently. We also heard that many, many features in most systems, possibly even a majority, are not needed or used; yet limiting scope to what is necessary seems to be an intractable problem. One solution to these problems can be found in concurrent engineering, which is widely used in product development as an alternative to sequential development. Concurrent engineering works more or less like a market economy: both depend on collaborating intelligent agents, both allow the end result emerge through communication, and both provide incentives for individuals to be creative and do everything necessary to achieve success.
_______________
References:
[1] Johnson, Jim, Chairman of The Standish Group, Keynote “ROI, It’s Your Job,” Third International Conference on Extreme Programming, Alghero, Italy, May, 26-29, 2002.

[2] Johnston, R B, and Brennan, M, “Planning or Organizing: the Implications of Theories of Activity for Management of Operations, Omega: The International Journal of Management Science, Vol 24 no. 4 pp. 367-384, Elsevier Science, 1996.

[3] Koskela1, Lauri, “On New Footnotes to Shingo”, 9th International Group for
Lean Construction Conference, Singapore, August, 6-8 2001.

[4] Levinson, Harry, “Management by Whose Objectives?” Harvard Business Review, Vol 81, no 1, January, 2003, Reprint of 1970 article.

[5] Austin, Robert D., Measuring and Managing Performance in Organizations, 1996, Dorset Publishing House

[6] Thimbleby, Harold, “Delaying Commitment”, IEEE Software, vol 5, no 3, May, 1988

[7] Clark, Kim B, Fujimoto, Takahiro, Product Development Performance; Strategy, Organization, and Management in the World Auto Industry, Harvard Business School Press, Boston, 1991.

[8] Thomas Group Inc., National Institute of Standards & Technology Institute for Defense Analyses, from Business Week, April 30, 1990, pp 111

[9] Weber Morales, Alexandra, “Extreme Quality”, Software Development, Volume 11, No 2, February 2003.

[10] Kotter, John P, “What Leaders Really Do,” Harvard Business Review, Vol 79, no 11, December, 2001, Reprint of 1990 article.

Screen Beans Art, © A Bit Better Corporation